Biomass power plant, California
HL Power biomass power plant, California
HL Power is a 36.2 MW biomass power plant in Lassen County, California, operated by HL Power Company, and it generated 196,377 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 87th percentile of U.S. biomass plants. By 2025 generation it ranks 2,520th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the HL Power plant run compared with other biomass plants?
The HL Power plant had a capacity factor of 74% in 2025 on 30 MW of net summer capacity, the 87th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 271 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| HL Power | 74% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the HL Power plant generating more or less than last year?
Generation at HL Power fell 4.1% from 2024 to 2025, from 204,807 MWh to 196,377 MWh.
| Period | MWh |
|---|---|
| 2024 | 204,807 |
| 2025 | 196,377 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 18,950 |
| November 2025 | 10,581 |
| October 2025 | 19,638 |
| September 2025 | 18,899 |
| August 2025 | 17,699 |
| July 2025 | 18,650 |
| June 2025 | 17,057 |
| May 2025 | 19,431 |
| April 2025 | 8,933 |
| March 2025 | 12,751 |
| February 2025 | 15,171 |
| January 2025 | 18,617 |
| December 2024 | 17,918 |
| November 2024 | 11,886 |
| October 2024 | 15,689 |
| September 2024 | 18,992 |
| August 2024 | 18,892 |
| July 2024 | 13,839 |
| June 2024 | 18,260 |
| May 2024 | 19,574 |
| April 2024 | 13,786 |
| March 2024 | 19,534 |
| February 2024 | 17,707 |
| January 2024 | 18,730 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the HL Power plant, and when do they retire?
1 operable generator totals 36.2 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 36 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Wood/Wood Waste Biomass | 36 | 1989 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the HL Power plant?
Greenleaf Power LLC is the only joint owner reported for HL Power, with 100.0%. HL Power Company operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the HL Power plant?
HL Power is in Wendel, Lassen County, California, at 40.3683° N, 120.2648° W. It sits in the California Independent System Operator balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in California are similar in size?
California has 99 operable biomass plants with 1,089 MW of capacity, and HL Power's 36.2 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Stockton Biomass | San Joaquin | 54 | 353,913 |
| Puente Hills Energy Recovery | Los Angeles | 50 | 149,853 |
| Total Energy Facilities | Los Angeles | 38 | 148,187 |
| HL Power | Lassen | 36 | 195,141 |
| Brea Expansion Plant | Orange | 36 | 233,119 |
| Sierra Pacific Quincy Facility | Plumas | 35 | 201,534 |
| Hyperion Treatment Plant CHP Plant | Los Angeles | 33 | 103,806 |
Source: EIA Forms EIA-860 and EIA-923, 2025.