Biomass power plant, California
Hyperion Treatment Plant CHP Plant, California
Hyperion Treatment Plant CHP Plant is a 33 MW biomass power plant in Los Angeles County, California, operated by Constellation New Energy Inc., and it generated 153,092 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in California, and its capacity factor sits at the 60th percentile of U.S. biomass plants. By 2025 generation it ranks 2,869th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does Hyperion Treatment Plant CHP Plant run compared with other biomass plants?
Hyperion Treatment Plant CHP Plant had a capacity factor of 54% in 2025 on 22 MW of net summer capacity, the 60th percentile of the 167 U.S. biomass plants with at least 20 MW. The typical biomass plant reached 48%. That equals about 197 days at full output out of 365.
0%Shaded: the middle half of biomass plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Hyperion Treatment Plant CHP Plant | 54% |
| Biomass plants, 75th percentile | 65% |
| Biomass plants, median | 48% |
| Biomass plants, 25th percentile | 35% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is Hyperion Treatment Plant CHP Plant generating more or less than last year?
Generation at Hyperion Treatment Plant CHP Plant rose 11.5% from 2024 to 2025, from 137,348 MWh to 153,092 MWh. Through August 2026 it is running 2.0% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 137,348 |
| 2025 | 153,092 |
| 2026 through August | 100,690 |
| 2025, same months | 98,751 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 13,674 |
| July 2026 | 12,190 |
| June 2026 | 12,877 |
| May 2026 | 13,321 |
| April 2026 | 9,952 |
| March 2026 | 13,343 |
| February 2026 | 12,160 |
| January 2026 | 13,173 |
| December 2025 | 14,743 |
| November 2025 | 14,077 |
| October 2025 | 12,460 |
| September 2025 | 13,061 |
| August 2025 | 13,684 |
| July 2025 | 13,287 |
| June 2025 | 12,607 |
| May 2025 | 13,178 |
| April 2025 | 9,545 |
| March 2025 | 13,020 |
| February 2025 | 11,737 |
| January 2025 | 11,693 |
| December 2024 | 12,837 |
| November 2024 | 12,189 |
| October 2024 | 12,116 |
| September 2024 | 12,558 |
| August 2024 | 13,019 |
| July 2024 | 10,714 |
| June 2024 | 12,138 |
| May 2024 | 12,479 |
| April 2024 | 9,570 |
| March 2024 | 12,884 |
| February 2024 | 4,423 |
| January 2024 | 12,421 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at Hyperion Treatment Plant CHP Plant, and when do they retire?
3 operable generators total 33 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 3 | 33 | 100% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| CTG1 | Operating | Other Waste Biomass | 11 | 2017 | n/a |
| CTG2 | Operating | Other Waste Biomass | 11 | 2017 | n/a |
| STG1 | Operating | Other Waste Biomass | 11 | 2017 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns Hyperion Treatment Plant CHP Plant?
Exelon is the only joint owner reported for Hyperion Treatment Plant CHP Plant, with 100.0%. Constellation New Energy Inc. operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is Hyperion Treatment Plant CHP Plant?
Hyperion Treatment Plant CHP Plant is in Playa del Rey, Los Angeles County, California, at 33.9254° N, 118.4298° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which biomass plants in California are similar in size?
California has 99 operable biomass plants with 1,089 MW of capacity, and Hyperion Treatment Plant CHP Plant's 33 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| HL Power | Lassen | 36 | 195,141 |
| Brea Expansion Plant | Orange | 36 | 233,119 |
| Sierra Pacific Quincy Facility | Plumas | 35 | 201,534 |
| Hyperion Treatment Plant CHP Plant | Los Angeles | 33 | 103,806 |
| Humboldt Sawmill Company | Humboldt | 33 | 106,452 |
| Burney Forest Products | Shasta | 31 | 71,993 |
| SPI Anderson 2 | Shasta | 30 | 121,201 |
Source: EIA Forms EIA-860 and EIA-923, 2025.