Wind power plant, Indiana

Hoosier Wind Project LLC power plant, Indiana

Hoosier Wind Project LLC is a 106 MW wind power plant in Benton County, Indiana, operated by AES Indiana, and it generated 243,460 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Indiana, and its capacity factor sits at the 26th percentile of U.S. wind plants. By 2025 generation it ranks 2,263rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

106 MWNameplate capacity
26%Capacity factor, 2025, 26th percentile, on 106 MW net summer
0.2%Of IN generation, 2025
16 yearsAverage generator age, by MW

How hard does the Hoosier Wind Project LLC plant run compared with other wind plants?

The Hoosier Wind Project LLC plant had a capacity factor of 26% in 2025 on 106 MW of net summer capacity, the 26th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 96 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hoosier Wind Project LLC26%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hoosier Wind Project LLC plant generating more or less than last year?

Hoosier Wind Project LLC generated 243,460 MWh in 2025; EIA reports no 2024 total to compare.

Net generation by period
PeriodMWh
2024n/a
2025243,460
Monthly generation, Jan 2025 to Dec 2025
MonthMWh
December 202535,202
November 202532,564
October 202517,462
September 20258,291
August 20258,786
July 20257,825
June 202514,003
May 202522,044
April 202525,940
March 202527,912
February 202518,095
January 202525,336

Source: EIA Form EIA-923, through August 2026.

How much of Indiana's electricity comes from the Hoosier Wind Project LLC plant?

Hoosier Wind Project LLC made 0.2% of the 106,870,299 MWh reported by Indiana plants in 2025, from 0.3% of the state's 33,631 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 66th largest of 221 plants in Indiana, the 2,485th largest of 14,327 in the U.S. and the 604th largest of 1,358 wind plants. By 2025 generation it is the 61st largest of 207 generating plants in the state.

Hoosier Wind Project LLC within Indiana, 2025
MeasureThis plantIndianaShare
Capacity (MW)10633,6310.3%
Generation (MWh)243,460106,870,2990.2%
Wind capacity (MW)1063,8572.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hoosier Wind Project LLC plant, and when do they retire?

1 operable generator totals 106 MW, with an average age of 16 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s1106100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
TBDOperatingOnshore Wind Turbine1062009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hoosier Wind Project LLC plant?

EIA lists no joint owners for Hoosier Wind Project LLC. AES Indiana operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does AES Indiana charge homes?

AES Indiana, the operator of Hoosier Wind Project LLC, had an average residential price of 14.69¢ per kWh and an average bill of $138 a month in 2025, 8% below the Indiana average of 15.96¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Indiana
AES Indiana14.69¢$1388% lower
Indiana average15.96¢$150
U.S. average17.23¢$1518% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Hoosier Wind Project LLC plant?

Hoosier Wind Project LLC is in Goodland, Benton County, Indiana, at 40.7178° N, 87.2631° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region RFC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Indiana are similar in size?

Indiana has 20 operable wind plants with 3,857 MW of capacity, and Hoosier Wind Project LLC's 106 MW is 3% of that.

Wind plants in Indiana around this size
PlantCountyMW2025 MWh
Bitter Ridge Wind Farm, LLCJay147359,751
Benton County Wind FarmBenton131342,874
Bluff Point Wind FacilityJay120378,572
Hoosier Wind Project LLCBenton106243,460
Meadow Lake Wind Farm IVWhite106103,535
Meadow Lake Wind Farm III LLCWhite104257,805
Meadow Lake Wind Farm II LLCWhite102237,698

Source: EIA Forms EIA-860 and EIA-923, 2025.