Wind power plant, Indiana
Meadow Lake Wind Farm IV power plant, Indiana
Meadow Lake Wind Farm IV is a 106 MW wind power plant in White County, Indiana, operated by Meadow Lake Wind Farm IV LLC, and it generated 103,535 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Indiana, and its capacity factor sits at the 3rd percentile of U.S. wind plants. By 2025 generation it ranks 3,354th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Meadow Lake Wind Farm IV plant run compared with other wind plants?
The Meadow Lake Wind Farm IV plant had a capacity factor of 11% in 2025 on 106 MW of net summer capacity, the 3rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 41 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Meadow Lake Wind Farm IV | 11% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Meadow Lake Wind Farm IV plant generating more or less than last year?
Generation at Meadow Lake Wind Farm IV fell 48.3% from 2024 to 2025, from 200,140 MWh to 103,535 MWh.
| Period | MWh |
|---|---|
| 2024 | 200,140 |
| 2025 | 103,535 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 7,261 |
| November 2025 | 7,940 |
| October 2025 | 4,584 |
| September 2025 | 328 |
| August 2025 | 232 |
| July 2025 | 355 |
| June 2025 | 1,664 |
| May 2025 | 6,531 |
| April 2025 | 12,968 |
| March 2025 | 22,706 |
| February 2025 | 16,297 |
| January 2025 | 22,669 |
| December 2024 | 22,610 |
| November 2024 | 20,888 |
| October 2024 | 15,200 |
| September 2024 | 5,872 |
| August 2024 | 4,817 |
| July 2024 | 5,421 |
| June 2024 | 14,978 |
| May 2024 | 12,736 |
| April 2024 | 27,573 |
| March 2024 | 28,554 |
| February 2024 | 20,922 |
| January 2024 | 20,569 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Meadow Lake Wind Farm IV plant, and when do they retire?
1 operable generator totals 106 MW, with an average age of 15 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 106 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN 1 | Operating | Onshore Wind Turbine | 106 | 2010 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Meadow Lake Wind Farm IV plant?
EIA lists no joint owners for Meadow Lake Wind Farm IV. Meadow Lake Wind Farm IV LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Meadow Lake Wind Farm IV plant?
Meadow Lake Wind Farm IV is in Lafayette, White County, Indiana, at 40.6778° N, 87.0328° W. It sits in the PJM Interconnection, LLC balancing area (NERC region RFC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in Indiana are similar in size?
Indiana has 20 operable wind plants with 3,857 MW of capacity, and Meadow Lake Wind Farm IV's 106 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Benton County Wind Farm | Benton | 131 | 342,874 |
| Bluff Point Wind Facility | Jay | 120 | 378,572 |
| Hoosier Wind Project LLC | Benton | 106 | 243,460 |
| Meadow Lake Wind Farm IV | White | 106 | 103,535 |
| Meadow Lake Wind Farm III LLC | White | 104 | 257,805 |
| Meadow Lake Wind Farm II LLC | White | 102 | 237,698 |
| Rosewater Wind Farm | White | 102 | 308,823 |
Source: EIA Forms EIA-860 and EIA-923, 2025.