Hoover Dam (AZ) is a 1,039 MW hydro power plant in Mohave County, Arizona, operated by U S Bureau of Reclamation, and it generated 927,107 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.8% of the generation reported in Arizona, and its capacity factor sits at the 6th percentile of U.S. hydro plants. By 2025 generation it ranks 772nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,039 MWNameplate capacity
10%Capacity factor, 2025, 6th percentile, on 1,040 MW net summer
0.8%Of AZ generation, 2025
81 yearsAverage generator age, by MW

How hard does the Hoover Dam (AZ) plant run compared with other hydro plants?

The Hoover Dam (AZ) plant had a capacity factor of 10% in 2025 on 1,040 MW of net summer capacity, the 6th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 37 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hoover Dam (AZ)10%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hoover Dam (AZ) plant generating more or less than last year?

Generation at Hoover Dam (AZ) fell 34.3% from 2024 to 2025, from 1,411,517 MWh to 927,107 MWh. Through August 2026 it is running 65.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,411,517
2025927,107
2026 through August1,073,294
2025, same months647,238
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202688,221
July 202697,559
June 2026101,441
May 2026115,806
April 2026194,627
March 2026224,215
February 2026139,035
January 2026112,390
December 202560,490
November 202590,290
October 202566,602
September 202562,487
August 202573,778
July 202590,449
June 2025111,334
May 2025108,369
April 202586,703
March 202578,630
February 202548,621
January 202549,354
December 202428,655
November 202453,770
October 2024106,229
September 2024106,554
August 2024121,481
July 2024147,755
June 2024174,870
May 2024173,212
April 2024159,929
March 2024165,993
February 202488,172
January 202484,897

Source: EIA Form EIA-923, through August 2026.

How much of Arizona's electricity comes from the Hoover Dam (AZ) plant?

Hoover Dam (AZ) made 0.8% of the 115,800,378 MWh reported by Arizona plants in 2025, from 2.6% of the state's 40,514 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 8th largest of 191 plants in Arizona, the 290th largest of 14,327 in the U.S. and the 12th largest of 1,393 hydro plants. By 2025 generation it is the 24th largest of 167 generating plants in the state.

Hoover Dam (AZ) within Arizona, 2025
MeasureThis plantArizonaShare
Capacity (MW)1,03940,5142.6%
Generation (MWh)927,107115,800,3780.8%
Hydro capacity (MW)1,0392,67938.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hoover Dam (AZ) plant, and when do they retire?

10 operable generators total 1,039 MW, with an average age of 81 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1930s432431%none reported
1940s338737%none reported
1950s332932%none reported
Every generator, 10 in all
UnitStatusTechnologyMWIn servicePlanned retirement
A0OperatingConventional Hydroelectric21936n/a
A8OperatingConventional Hydroelectric621937n/a
A6OperatingConventional Hydroelectric1301939n/a
A7OperatingConventional Hydroelectric1301939n/a
A1OperatingConventional Hydroelectric1301941n/a
A2OperatingConventional Hydroelectric1301942n/a
A5OperatingConventional Hydroelectric1271943n/a
A3OperatingConventional Hydroelectric1301952n/a
A4OperatingConventional Hydroelectric1301952n/a
A9OperatingConventional Hydroelectric691952n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hoover Dam (AZ) plant?

EIA lists no joint owners for Hoover Dam (AZ). U S Bureau of Reclamation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hoover Dam (AZ) plant?

Hoover Dam (AZ) is in Boulder City, Mohave County, Arizona, at 36.0155° N, 114.7380° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Arizona are similar in size?

Arizona has 8 operable hydro plants with 2,679 MW of capacity, and Hoover Dam (AZ)'s 1,039 MW is 39% of that.

Hydro plants in Arizona around this size
PlantCountyMW2025 MWh
Glen Canyon DamCoconino1,3122,752,624
Hoover Dam (AZ)Mohave1,039927,107