Hydro power plant, Nevada

Hoover Dam, Nevada

Hoover Dam (NV) is a 1,039 MW hydro power plant in Clark County, Nevada, operated by U S Bureau of Reclamation, and it generated 1,807,912 MWh in 2025 (Forms EIA-860 and EIA-923). That is 4.0% of the generation reported in Nevada, and its capacity factor sits at the 20th percentile of U.S. hydro plants. By 2025 generation it ranks 539th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,039 MWNameplate capacity
20%Capacity factor, 2025, 20th percentile, on 1,039 MW net summer
4.0%Of NV generation, 2025
84 yearsAverage generator age, by MW

How hard does the Hoover Dam (NV) plant run compared with other hydro plants?

The Hoover Dam (NV) plant had a capacity factor of 20% in 2025 on 1,039 MW of net summer capacity, the 20th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 72 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hoover Dam (NV)20%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hoover Dam (NV) plant generating more or less than last year?

Generation at Hoover Dam (NV) rose 18.0% from 2024 to 2025, from 1,531,949 MWh to 1,807,912 MWh. Through August 2026 it is running 35.1% behind the same months of 2025.

Net generation by period
PeriodMWh
20241,531,949
20251,807,912
2026 through August975,180
2025, same months1,502,836
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026126,813
July 2026151,462
June 2026195,695
May 2026207,292
April 2026134,974
March 202686,537
February 202642,471
January 202629,936
December 202535,476
November 202560,430
October 2025108,041
September 2025101,129
August 2025152,270
July 2025170,947
June 2025179,380
May 2025255,396
April 2025258,334
March 2025214,546
February 2025145,011
January 2025126,952
December 2024126,767
November 2024137,691
October 2024140,513
September 202484,254
August 2024104,007
July 2024130,387
June 2024180,030
May 2024203,942
April 2024184,175
March 2024142,446
February 202447,077
January 202450,660

Source: EIA Form EIA-923, through August 2026.

How much of Nevada's electricity comes from the Hoover Dam (NV) plant?

Hoover Dam (NV) made 4.0% of the 45,180,066 MWh reported by Nevada plants in 2025, from 5.5% of the state's 18,959 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 5th largest of 117 plants in Nevada, the 290th largest of 14,327 in the U.S. and the 11th largest of 1,393 hydro plants. By 2025 generation it is the 7th largest of 112 generating plants in the state.

Hoover Dam (NV) within Nevada, 2025
MeasureThis plantNevadaShare
Capacity (MW)1,03918,9595.5%
Generation (MWh)1,807,91245,180,0664.0%
Hydro capacity (MW)1,0391,05398.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hoover Dam (NV) plant, and when do they retire?

9 operable generators total 1,039 MW, with an average age of 84 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1930s778275%none reported
1940s112712%none reported
1960s113013%none reported
Every generator, 9 in all
UnitStatusTechnologyMWIn servicePlanned retirement
N0OperatingConventional Hydroelectric21936n/a
N1OperatingConventional Hydroelectric1301936n/a
N2OperatingConventional Hydroelectric1301936n/a
N4OperatingConventional Hydroelectric1301936n/a
N3OperatingConventional Hydroelectric1301937n/a
N5OperatingConventional Hydroelectric1301938n/a
N6OperatingConventional Hydroelectric1301938n/a
N7OperatingConventional Hydroelectric1271944n/a
N8OperatingConventional Hydroelectric1301961n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hoover Dam (NV) plant?

EIA lists no joint owners for Hoover Dam (NV). U S Bureau of Reclamation operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Hoover Dam (NV) plant?

Hoover Dam (NV) is in Boulder City, Clark County, Nevada, at 36.0155° N, 114.7380° W. It sits in the Western Area Power Administration - Desert Southwest Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.