Battery and pumped storage power plant, Arizona
Horse Mesa storage power plant, Arizona
Horse Mesa is a 131 MW power plant, 99.8 MW of it battery and pumped storage, in Maricopa County, Arizona, operated by Salt River Project, and it generated 87,872 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Arizona, and its capacity factor sits at the 33rd percentile of U.S. battery and pumped storage plants. By 2025 generation it ranks 3,547th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Horse Mesa plant run compared with other battery and pumped storage plants?
The Horse Mesa plant's battery and pumped storage units had a capacity factor of 6% in 2025 on 119 MW of net summer capacity, the 33rd percentile of the 9 U.S. battery and pumped storage plants with at least 20 MW. The typical battery and pumped storage plant reached 6%. That equals about 21 days at full output out of 365.
0%Shaded: the middle half of battery and pumped storage plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Horse Mesa | 6% |
| Battery and pumped storage plants, 75th percentile | 14% |
| Battery and pumped storage plants, median | 6% |
| Battery and pumped storage plants, 25th percentile | 5% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its battery and pumped storage generators only. Values above 105% are left out of the comparison.
Is the Horse Mesa plant generating more or less than last year?
Horse Mesa generated 87,872 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 20.0% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.
3 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.
| Period | MWh |
|---|---|
| 2024 | 98,355 |
| 2025 | 87,872 |
| 2026 through August | 55,162 |
| 2025, same months | 68,940 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 6,984 |
| July 2026 | 4,833 |
| June 2026 | 14,781 |
| May 2026 | 20,839 |
| April 2026 | 8,553 |
| March 2026 | 1,839 |
| February 2026 | -526 |
| January 2026 | -2,141 |
| December 2025 | 242 |
| November 2025 | 4,744 |
| October 2025 | 3,165 |
| September 2025 | 10,781 |
| August 2025 | 16,004 |
| July 2025 | 14,873 |
| June 2025 | 14,267 |
| May 2025 | 6,618 |
| April 2025 | 4,310 |
| March 2025 | 5,359 |
| February 2025 | 4,320 |
| January 2025 | 3,189 |
| December 2024 | 204 |
| November 2024 | 4,975 |
| October 2024 | 11,464 |
| September 2024 | 15,067 |
| August 2024 | 16,793 |
| July 2024 | 17,404 |
| June 2024 | 16,694 |
| May 2024 | 11,772 |
| April 2024 | 5,816 |
| March 2024 | -2,626 |
| February 2024 | 501 |
| January 2024 | 291 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Horse Mesa plant, and when do they retire?
4 operable generators total 131 MW, with an average age of 98 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1920s | 4 | 131 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| HM1 | Operating | Conventional Hydroelectric | 10 | 1927 | n/a |
| HM2 | Operating | Conventional Hydroelectric | 10 | 1927 | n/a |
| HM3 | Out of service, returning | Conventional Hydroelectric | 12 | 1927 | n/a |
| HM4 | Operating | Hydroelectric Pumped Storage | 100 | 1927 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Horse Mesa plant?
EIA lists no joint owners for Horse Mesa. Salt River Project operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Salt River Project charge homes?
Salt River Project, the operator of Horse Mesa, had an average residential price of 13.98¢ per kWh and an average bill of $160 a month in 2025, 8% below the Arizona average of 15.26¢.
| Measure | Price | Monthly bill | Against Arizona |
|---|---|---|---|
| Salt River Project | 13.98¢ | $160 | 8% lower |
| Arizona average | 15.26¢ | $157 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
What fuels does the Horse Mesa plant use?
Horse Mesa has capacity on 2 fuels: 76% battery and pumped storage and 24% hydro. In 2025, battery and pumped storage made 68% of its output.
| Fuel | MW | Share | 2025 MWh |
|---|---|---|---|
| Battery and pumped storage | 100 | 76.0% | 59,981 |
| Hydro | 32 | 24.0% | 27,891 |
Source: EIA Forms EIA-860 and EIA-923, 2025.
Where is the Horse Mesa plant?
Horse Mesa is in Apache Junction, Maricopa County, Arizona, at 33.5907° N, 111.3440° W. It sits in the Salt River Project balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which battery and pumped storage plants in Arizona are similar in size?
Arizona has 24 operable battery and pumped storage plants with 2,971 MW of capacity, and Horse Mesa's 99.8 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Atlas IX | La Paz | 150 | -1,535 |
| Sierra Pinta BESS | Yuma | 113 | -5,140 |
| Saint Energy Storage II LLC | Pinal | 100 | -16,651 |
| Horse Mesa | Maricopa | 100 | 59,981 |
| Superstition Energy Storage | Maricopa | 90 | -15,938 |
| Scatter Wash 2 | Maricopa | 85 | -10,382 |
| Pluto Energy Storage | Maricopa | 75 | -12,164 |