Natural gas power plant, New York

Indeck Corinth Energy Center, New York

Indeck Corinth Energy Center is a 147 MW natural gas power plant in Saratoga County, New York, operated by Indeck-Corinth Ltd Partnership, and it generated 544,447 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in New York, and its capacity factor sits at the 70th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,257th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

147 MWNameplate capacity
49%Capacity factor, 2025, 70th percentile, on 126 MW net summer
0.4%Of NY generation, 2025
30 yearsAverage generator age, by MW

How hard does the Indeck Corinth Energy Center plant run compared with other natural gas plants?

The Indeck Corinth Energy Center plant had a capacity factor of 49% in 2025 on 126 MW of net summer capacity, the 70th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 181 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Indeck Corinth Energy Center49%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Indeck Corinth Energy Center plant generating more or less than last year?

Generation at Indeck Corinth Energy Center rose 28.9% from 2024 to 2025, from 422,252 MWh to 544,447 MWh.

Net generation by period
PeriodMWh
2024422,252
2025544,447
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202550,818
November 202546,132
October 202590,277
September 202556,618
August 202576,847
July 202587,135
June 202547,516
May 20255,155
April 20255,813
March 202534,658
February 202519,267
January 202524,211
December 202466,366
November 202454,031
October 202445,164
September 20249,244
August 202411,116
July 202476,829
June 202449,881
May 202424,088
April 2024929
March 20245,785
February 202442,568
January 202436,251

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Indeck Corinth Energy Center plant?

Indeck Corinth Energy Center made 0.4% of the 130,607,810 MWh reported by New York plants in 2025, from 0.3% of the state's 44,194 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 43rd largest of 1,145 plants in New York, the 2,099th largest of 14,327 in the U.S. and the 793rd largest of 1,962 natural gas plants. By 2025 generation it is the 30th largest of 1,049 generating plants in the state.

Indeck Corinth Energy Center within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)14744,1940.3%
Generation (MWh)544,447130,607,8100.4%
Natural gas capacity (MW)14724,2550.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Indeck Corinth Energy Center plant, and when do they retire?

2 operable generators total 147 MW, with an average age of 30 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s2147100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combined Cycle921995n/a
GEN2OperatingNatural Gas Fired Combined Cycle551995n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Indeck Corinth Energy Center plant?

EIA lists no joint owners for Indeck Corinth Energy Center. Indeck-Corinth Ltd Partnership operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Indeck Corinth Energy Center plant?

Indeck Corinth Energy Center is in Corinth, Saratoga County, New York, at 43.2500° N, 73.8125° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New York are similar in size?

New York has 104 operable natural gas plants with 24,255 MW of capacity, and Indeck Corinth Energy Center's 147 MW is 1% of that.

Natural gas plants in New York around this size
PlantCountyMW2025 MWh
Lockport Energy Associates LPNiagara221412,995
Richard M FlynnSuffolk170325,085
RED-Rochester, LLCMonroe162344,880
Indeck Corinth Energy CenterSaratoga147544,186
Carr Street Generating StationOnondaga123227,584
Kennedy International Airport CogenQueens121609,106
Equus Freeport PowerNassau12059,833

Source: EIA Forms EIA-860 and EIA-923, 2025.