Skip to main content
RateWatt

Natural gas power plant, New York

Kennedy International Airport Cogen natural gas power plant, New York

Kennedy International Airport Cogen is a 121 MW natural gas power plant in Queens County, New York, operated by KIAC Partners, and it generated 609,106 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.5% of the generation reported in New York, and its capacity factor sits at the 75th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,116th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

121 MWNameplate capacity
56%Capacity factor, 2025, 75th percentile, on 123 MW net summer
0.5%Of NY generation, 2025
31 yearsAverage generator age, by MW

How hard does the Kennedy International Airport Cogen plant run compared with other natural gas plants?

The Kennedy International Airport Cogen plant had a capacity factor of 56% in 2025 on 123 MW of net summer capacity, the 75th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 206 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Kennedy International Airport Cogen56%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Kennedy International Airport Cogen plant generating more or less than last year?

Kennedy International Airport Cogen generated 609,106 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024398,557
2025609,106
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202565,244
November 202527,422
October 202534,572
September 202548,356
August 202550,762
July 202557,412
June 202553,445
May 202546,177
April 202548,602
March 202548,333
February 202568,252
January 202560,529
December 202423,703
November 202449,638
October 202448,350
September 202449,507
August 202453,645
July 202456,624
June 202446,629
May 202439,192
April 202431,269
March 20240
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of New York's electricity comes from the Kennedy International Airport Cogen plant?

Kennedy International Airport Cogen made 0.5% of the 130,607,810 MWh reported by New York plants in 2025, from 0.3% of the state's 44,194 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 50th largest of 1,145 plants in New York, the 2,302nd largest of 14,327 in the U.S. and the 841st largest of 1,962 natural gas plants. By 2025 generation it is the 28th largest of 1,049 generating plants in the state.

Kennedy International Airport Cogen within New York, 2025
MeasureThis plantNew YorkShare
Capacity (MW)12144,1940.3%
Generation (MWh)609,106130,607,8100.5%
Natural gas capacity (MW)12124,2550.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Kennedy International Airport Cogen plant, and when do they retire?

3 operable generators total 121 MW, with an average age of 31 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s3121100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combined Cycle471994n/a
GEN2OperatingNatural Gas Fired Combined Cycle471994n/a
GEN3OperatingNatural Gas Fired Combined Cycle271995n/a
CT-3CancelledNatural Gas Fired Combustion Turbine50n/an/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Kennedy International Airport Cogen plant?

Calpine Corp is the only joint owner reported for Kennedy International Airport Cogen, with 100.0%. KIAC Partners operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Kennedy International Airport Cogen plant?

Kennedy International Airport Cogen is in Jamaica, Queens County, New York, at 40.6417° N, 73.7778° W. It sits in the New York Independent System Operator balancing area (NERC region NPCC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New York are similar in size?

New York has 104 operable natural gas plants with 24,255 MW of capacity, and Kennedy International Airport Cogen's 121 MW is 0% of that.

Natural gas plants in New York around this size
PlantCountyMW2025 MWh
RED-Rochester, LLCMonroe162344,880
Indeck Corinth Energy CenterSaratoga147544,186
Carr Street Generating StationOnondaga123227,584
Kennedy International Airport CogenQueens121609,106
Equus Freeport PowerNassau12059,833
Greenidge Generation LLCYates112624,908
CH Resources Beaver FallsLewis10811,161

Source: EIA Forms EIA-860 and EIA-923, 2025.