Natural gas power plant, Utah
Intermountain Power Project, Utah
Intermountain Power Project is a 1,093 MW natural gas power plant in Millard County, Utah, operated by Los Angeles Department of Water & Power, and it generated 4,803,126 MWh in 2025 (Forms EIA-860 and EIA-923). That is 12.6% of the generation reported in Utah, and its capacity factor sits at the 29th percentile of U.S. natural gas plants. By 2025 generation it ranks 229th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Intermountain Power Project plant run compared with other natural gas plants?
The Intermountain Power Project plant had a capacity factor of 7% in 2025 on 940 MW of net summer capacity, the 29th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 26 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Intermountain Power Project | 7% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Intermountain Power Project plant generating more or less than last year?
Generation at Intermountain Power Project fell 15.9% from 2024 to 2025, from 5,707,831 MWh to 4,803,126 MWh. Through August 2026 it is running 22.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 5,707,831 |
| 2025 | 4,803,126 |
| 2026 through August | 3,863,255 |
| 2025, same months | 3,163,730 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 646,647 |
| July 2026 | 620,454 |
| June 2026 | 325,976 |
| May 2026 | 412,769 |
| April 2026 | 267,520 |
| March 2026 | 551,254 |
| February 2026 | 538,477 |
| January 2026 | 500,158 |
| December 2025 | 306,461 |
| November 2025 | 686,259 |
| October 2025 | 327,895 |
| September 2025 | 318,781 |
| August 2025 | 329,098 |
| July 2025 | 299,358 |
| June 2025 | 230,363 |
| May 2025 | 226,686 |
| April 2025 | 142,405 |
| March 2025 | 417,770 |
| February 2025 | 691,565 |
| January 2025 | 826,485 |
| December 2024 | 791,559 |
| November 2024 | 726,536 |
| October 2024 | 822,104 |
| September 2024 | 820,046 |
| August 2024 | 607,510 |
| July 2024 | 592,033 |
| June 2024 | 267,167 |
| May 2024 | 213,902 |
| April 2024 | 157,996 |
| March 2024 | 218,876 |
| February 2024 | 211,498 |
| January 2024 | 278,604 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Intermountain Power Project plant, and when do they retire?
2 operable generators total 1,093 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 2 have already retired, totalling 1,640 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 2 | 1,093 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 3 | Operating | Natural Gas Fired Combined Cycle | 547 | 2025 | n/a |
| 4 | Operating | Natural Gas Fired Combined Cycle | 547 | 2025 | n/a |
| 1 | Retired | Conventional Steam Coal | 820 | 1986 | 2025 |
| 2 | Retired | Conventional Steam Coal | 820 | 1987 | 2025 |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Intermountain Power Project plant?
Intermountain Power Agency is the only joint owner reported for Intermountain Power Project, with 100.0%. Los Angeles Department of Water & Power operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Los Angeles Department of Water & Power charge homes?
Los Angeles Department of Water & Power, the operator of Intermountain Power Project, had an average residential price of 26.48¢ per kWh and an average bill of $124 a month in 2025 in California.
| Measure | Price | Monthly bill | Against Utah |
|---|---|---|---|
| Los Angeles Department of Water & Power | 26.48¢ | $124 | other state |
| Utah average | 13.02¢ | $99 | |
| U.S. average | 17.23¢ | $151 | 32% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the Intermountain Power Project plant?
Intermountain Power Project is in Delta, Millard County, Utah, at 39.5097° N, 112.5802° W. It sits in the Los Angeles Department of Water and Power balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Utah are similar in size?
Utah has 22 operable natural gas plants with 4,023 MW of capacity, and Intermountain Power Project's 1,093 MW is 27% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Lake Side Power Plant | Utah | 1,247 | 6,049,458 |
| Intermountain Power Project | Millard | 1,093 | 594,689 |
| Currant Creek | Juab | 567 | 2,803,076 |
Source: EIA Forms EIA-860 and EIA-923, 2025.