Natural gas power plant, Utah

Lake Side Power Plant, Utah

Lake Side Power Plant is a 1,247 MW natural gas power plant in Utah County, Utah, operated by PacifiCorp, and it generated 6,049,458 MWh in 2025 (Forms EIA-860 and EIA-923). That is 15.9% of the generation reported in Utah, and its capacity factor sits at the 77th percentile of U.S. natural gas plants. By 2025 generation it ranks 170th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,247 MWNameplate capacity
59%Capacity factor, 2025, 77th percentile, on 1,176 MW net summer
15.9%Of UT generation, 2025
14 yearsAverage generator age, by MW

How hard does Lake Side Power Plant run compared with other natural gas plants?

Lake Side Power Plant had a capacity factor of 59% in 2025 on 1,176 MW of net summer capacity, the 77th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 214 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Lake Side Power Plant59%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Lake Side Power Plant generating more or less than last year?

Generation at Lake Side Power Plant fell 0.9% from 2024 to 2025, from 6,106,345 MWh to 6,049,458 MWh. Through August 2026 it is running 9.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20246,106,345
20256,049,458
2026 through August4,121,717
2025, same months3,759,196
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026671,640
July 2026662,653
June 2026495,241
May 2026395,988
April 2026423,970
March 2026487,945
February 2026438,747
January 2026545,533
December 2025606,081
November 2025559,131
October 2025495,372
September 2025629,678
August 2025618,995
July 2025620,651
June 2025504,721
May 2025269,941
April 2025260,341
March 2025442,179
February 2025468,338
January 2025574,030
December 2024580,098
November 2024415,628
October 2024543,623
September 2024452,771
August 2024603,151
July 2024610,480
June 2024532,291
May 2024429,130
April 2024313,513
March 2024454,242
February 2024568,091
January 2024603,327

Source: EIA Form EIA-923, through August 2026.

How much of Utah's electricity comes from Lake Side Power Plant?

Lake Side Power Plant made 15.9% of the 38,124,679 MWh reported by Utah plants in 2025, from 11.2% of the state's 11,140 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 2nd largest of 126 plants in Utah, the 204th largest of 14,327 in the U.S. and the 76th largest of 1,962 natural gas plants. By 2025 generation it is the 2nd largest of 117 generating plants in the state.

Lake Side Power Plant within Utah, 2025
MeasureThis plantUtahShare
Capacity (MW)1,24711,14011.2%
Generation (MWh)6,049,45838,124,67915.9%
Natural gas capacity (MW)1,2474,02331.0%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Lake Side Power Plant, and when do they retire?

6 operable generators total 1,247 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s359147%none reported
2010s365553%none reported
Every generator, 6 in all
UnitStatusTechnologyMWIn servicePlanned retirement
CT01OperatingNatural Gas Fired Combined Cycle1832007n/a
CT02OperatingNatural Gas Fired Combined Cycle1832007n/a
ST01OperatingNatural Gas Fired Combined Cycle2262007n/a
CT21OperatingNatural Gas Fired Combined Cycle1852014n/a
CT22OperatingNatural Gas Fired Combined Cycle1852014n/a
ST2OperatingNatural Gas Fired Combined Cycle2842014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Lake Side Power Plant?

EIA lists no joint owners for Lake Side Power Plant. PacifiCorp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does PacifiCorp charge homes?

PacifiCorp, the operator of Lake Side Power Plant, had an average residential price of 13.52¢ per kWh and an average bill of $101 a month in 2025, 4% above the Utah average of 13.02¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Utah
PacifiCorp13.52¢$1014% higher
Utah average13.02¢$99
U.S. average17.23¢$15132% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is Lake Side Power Plant?

Lake Side Power Plant is in Vineyard, Utah County, Utah, at 40.3317° N, 111.7542° W. It sits in the PacifiCorp - East balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Utah are similar in size?

Utah has 22 operable natural gas plants with 4,023 MW of capacity, and Lake Side Power Plant's 1,247 MW is 31% of that.

Natural gas plants in Utah around this size
PlantCountyMW2025 MWh
Lake Side Power PlantUtah1,2476,049,458
Intermountain Power ProjectMillard1,093594,689

Source: EIA Forms EIA-860 and EIA-923, 2025.