Natural gas power plant, Florida

J D Kennedy natural gas power plant, Florida

J D Kennedy is a 370 MW natural gas power plant in Duval County, Florida, operated by Jea, and it generated 311,007 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 35th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,930th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

370 MWNameplate capacity
10%Capacity factor, 2025, 35th percentile, on 357 MW net summer
0.1%Of FL generation, 2025
21 yearsAverage generator age, by MW

How hard does the J D Kennedy plant run compared with other natural gas plants?

The J D Kennedy plant had a capacity factor of 10% in 2025 on 357 MW of net summer capacity, the 35th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 36 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
J D Kennedy10%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the J D Kennedy plant generating more or less than last year?

Generation at J D Kennedy rose 73.0% from 2024 to 2025, from 179,784 MWh to 311,007 MWh.

Net generation by period
PeriodMWh
2024179,784
2025311,007
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025641
November 20255,147
October 20255,089
September 202510,807
August 202514,927
July 202520,582
June 202532,593
May 202554,342
April 202553,342
March 202520,065
February 202523,872
January 202569,601
December 202429,799
November 202426,126
October 202410,100
September 202417,661
August 202412,986
July 202418,327
June 202416,836
May 20248,263
April 20246,201
March 20244,075
February 202414,449
January 202414,959

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the J D Kennedy plant?

J D Kennedy made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.5% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 45th largest of 331 plants in Florida, the 893rd largest of 14,327 in the U.S. and the 539th largest of 1,962 natural gas plants. By 2025 generation it is the 56th largest of 313 generating plants in the state.

J D Kennedy within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)37079,9360.5%
Generation (MWh)311,007267,867,7350.1%
Natural gas capacity (MW)37052,8940.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the J D Kennedy plant, and when do they retire?

2 operable generators total 370 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 169 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2370100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GT37OperatingNatural Gas Fired Combustion Turbine1852000n/a
GT38OperatingNatural Gas Fired Combustion Turbine1852009n/a
GT3RetiredPetroleum Liquids5619732009
GT4RetiredPetroleum Liquids5619732008
GT5RetiredPetroleum Liquids5619732008

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the J D Kennedy plant?

EIA lists no joint owners for J D Kennedy. Jea operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does JEA charge homes?

JEA, the operator of J D Kennedy, had an average residential price of 13.84¢ per kWh and an average bill of $146 a month in 2025, 9% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
JEA13.84¢$1469% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the J D Kennedy plant?

J D Kennedy is in Jacksonville, Duval County, Florida, at 30.3648° N, 81.6260° W. It sits in the JEA balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and J D Kennedy's 370 MW is 1% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Hardee Power StationHardee470792,540
Treasure Coast Energy CenterSt Lucie4111,747,433
Greenland Energy CenterDuval381654,854
J D KennedyDuval370308,298
Indian River PlantBrevard3434,349
Tiger BayPolk278761,923
Santa Rosa Energy CenterSanta Rosa2751,137,623

Source: EIA Forms EIA-860 and EIA-923, 2025.