Wind power plant, Oregon

Klondike Windpower III wind power plant, Oregon

Klondike Windpower III is a 298 MW wind power plant in Sherman County, Oregon, operated by Avangrid Power LLC, and it generated 706,799 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.1% of the generation reported in Oregon, and its capacity factor sits at the 29th percentile of U.S. wind plants. By 2025 generation it ranks 981st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

298 MWNameplate capacity
27%Capacity factor, 2025, 29th percentile, on 298 MW net summer
1.1%Of OR generation, 2025
18 yearsAverage generator age, by MW

How hard does the Klondike Windpower III plant run compared with other wind plants?

The Klondike Windpower III plant had a capacity factor of 27% in 2025 on 298 MW of net summer capacity, the 29th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 99 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Klondike Windpower III27%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Klondike Windpower III plant generating more or less than last year?

Generation at Klondike Windpower III fell 3.2% from 2024 to 2025, from 730,530 MWh to 706,799 MWh. Through August 2026 it is running 5.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024730,530
2025706,799
2026 through August553,197
2025, same months526,808
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202687,574
July 202693,641
June 202695,754
May 202689,626
April 202672,783
March 202675,215
February 202622,075
January 202616,529
December 202551,998
November 202529,685
October 202545,927
September 202552,381
August 202572,063
July 202597,026
June 202595,716
May 202588,934
April 202568,985
March 202557,109
February 202525,308
January 202521,667
December 202419,868
November 202444,677
October 202445,343
September 202474,469
August 202474,891
July 202488,678
June 202480,554
May 2024104,284
April 202475,005
March 202444,752
February 202443,551
January 202434,458

Source: EIA Form EIA-923, through August 2026.

How much of Oregon's electricity comes from the Klondike Windpower III plant?

Klondike Windpower III made 1.1% of the 64,124,656 MWh reported by Oregon plants in 2025, from 1.6% of the state's 19,040 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 14th largest of 302 plants in Oregon, the 1,103rd largest of 14,327 in the U.S. and the 103rd largest of 1,358 wind plants. By 2025 generation it is the 18th largest of 278 generating plants in the state.

Klondike Windpower III within Oregon, 2025
MeasureThis plantOregonShare
Capacity (MW)29819,0401.6%
Generation (MWh)706,79964,124,6561.1%
Wind capacity (MW)2984,1817.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Klondike Windpower III plant, and when do they retire?

2 operable generators total 298 MW, with an average age of 18 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2298100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2212007n/a
2OperatingOnshore Wind Turbine772008n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Klondike Windpower III plant?

EIA lists no joint owners for Klondike Windpower III. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Klondike Windpower III plant?

Klondike Windpower III is in Wasco, Sherman County, Oregon, at 45.5836° N, 120.5042° W. It sits in the Avangrid Renewables LLC balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Oregon are similar in size?

Oregon has 50 operable wind plants with 4,181 MW of capacity, and Klondike Windpower III's 298 MW is 7% of that.

Wind plants in Oregon around this size
PlantCountyMW2025 MWh
Biglow Canyon Wind FarmSherman450900,879
Klondike Windpower IIISherman298706,799
South Hurlburt Wind LLCGilliam290564,445
Horseshoe Bend Wind LLCGilliam290591,702
North Hurlburt Wind LLCGilliam265516,983

Source: EIA Forms EIA-860 and EIA-923, 2025.