Coal power plant, Missouri

Labadie coal power plant, Missouri

Labadie is a 2,389 MW coal power plant in Franklin County, Missouri, operated by Union Electric Co-(MO), and it generated 16,728,972 MWh in 2025 (Forms EIA-860 and EIA-923). That is 23.4% of the generation reported in Missouri, and its capacity factor sits at the 96th percentile of U.S. coal plants. By 2025 generation it ranks 22nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

2,389 MWNameplate capacity
80%Capacity factor, 2025, 96th percentile, on 2,372 MW net summer
23.4%Of MO generation, 2025
53 yearsAverage generator age, by MW

How hard does the Labadie plant run compared with other coal plants?

The Labadie plant had a capacity factor of 80% in 2025 on 2,372 MW of net summer capacity, the 96th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 294 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Labadie80%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Labadie plant generating more or less than last year?

Generation at Labadie rose 16.2% from 2024 to 2025, from 14,401,714 MWh to 16,728,972 MWh. Through August 2026 it is running 13.6% behind the same months of 2025.

Net generation by period
PeriodMWh
202414,401,714
202516,728,972
2026 through August9,761,806
2025, same months11,299,989
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20261,391,360
July 20261,518,668
June 20261,049,669
May 20261,120,634
April 2026900,609
March 20261,054,028
February 20261,194,327
January 20261,532,511
December 20251,524,653
November 20251,470,348
October 20251,135,442
September 20251,298,540
August 20251,362,852
July 20251,308,451
June 20251,464,626
May 20251,457,717
April 20251,425,100
March 20251,489,425
February 20251,464,758
January 20251,327,060
December 2024993,892
November 2024842,426
October 20241,093,697
September 20241,124,642
August 20241,395,959
July 20241,472,445
June 20241,204,991
May 20241,388,953
April 2024973,917
March 2024973,653
February 20241,344,337
January 20241,592,802

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the Labadie plant?

Labadie made 23.4% of the 71,443,096 MWh reported by Missouri plants in 2025, from 10.3% of the state's 23,215 MW of capacity. Its share of output is 2.3 times its share of capacity. By capacity it is the largest of 137 plants in Missouri, the 43rd largest of 14,327 in the U.S. and the 13th largest of 195 coal plants. By 2025 generation it is the largest of 122 generating plants in the state.

Labadie within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)2,38923,21510.3%
Generation (MWh)16,728,97271,443,09623.4%
Coal capacity (MW)2,3899,04826.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Labadie plant, and when do they retire?

4 operable generators total 2,389 MW, with an average age of 53 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s42,389100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal5741970n/a
2OperatingConventional Steam Coal5741971n/a
3OperatingConventional Steam Coal6211972n/a
4OperatingConventional Steam Coal6211973n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Labadie plant?

EIA lists no joint owners for Labadie. Union Electric Co-(MO) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Union Electric Co charge homes?

Union Electric Co, the operator of Labadie, had an average residential price of 13.27¢ per kWh and an average bill of $137 a month in 2025, about the same as the Missouri average of 13.30¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Missouri
Union Electric Co13.27¢$137about the same
Missouri average13.30¢$138
U.S. average17.23¢$15130% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Labadie plant?

Labadie is in Labadie, Franklin County, Missouri, at 38.5622° N, 90.8377° W. It sits in the Midcontinent Independent Transmission System Operator, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Missouri are similar in size?

Missouri has 8 operable coal plants with 9,048 MW of capacity, and Labadie's 2,389 MW is 26% of that.

Coal plants in Missouri around this size
PlantCountyMW2025 MWh
LabadieFranklin2,38916,719,646
IatanPlatte1,7545,717,960
New MadridNew Madrid1,3006,734,946

Source: EIA Forms EIA-860 and EIA-923, 2025.