Coal power plant, Missouri

New Madrid coal power plant, Missouri

New Madrid is a 1,300 MW coal power plant in New Madrid County, Missouri, operated by Associated Electric Coop, Inc, and it generated 6,738,552 MWh in 2025 (Forms EIA-860 and EIA-923). That is 9.4% of the generation reported in Missouri, and its capacity factor sits at the 78th percentile of U.S. coal plants. By 2025 generation it ranks 145th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,300 MWNameplate capacity
64%Capacity factor, 2025, 78th percentile, on 1,200 MW net summer
9.4%Of MO generation, 2025
51 yearsAverage generator age, by MW

How hard does the New Madrid plant run compared with other coal plants?

The New Madrid plant had a capacity factor of 64% in 2025 on 1,200 MW of net summer capacity, the 78th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 234 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
New Madrid64%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the New Madrid plant generating more or less than last year?

Generation at New Madrid rose 26.5% from 2024 to 2025, from 5,325,976 MWh to 6,738,552 MWh. Through August 2026 it is running 13.4% behind the same months of 2025.

Net generation by period
PeriodMWh
20245,325,976
20256,738,552
2026 through August4,198,997
2025, same months4,846,818
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026281,221
July 2026636,733
June 2026540,024
May 2026545,366
April 2026513,578
March 2026382,079
February 2026580,661
January 2026719,335
December 2025755,376
November 2025620,759
October 2025217,860
September 2025297,739
August 2025580,823
July 2025561,467
June 2025558,298
May 2025593,687
April 2025498,570
March 2025540,202
February 2025702,450
January 2025811,321
December 2024689,568
November 2024277,899
October 2024535,876
September 2024459,759
August 2024501,658
July 2024562,606
June 2024437,338
May 2024494,286
April 2024417,200
March 2024172,092
February 202452,606
January 2024725,088

Source: EIA Form EIA-923, through August 2026.

How much of Missouri's electricity comes from the New Madrid plant?

New Madrid made 9.4% of the 71,443,096 MWh reported by Missouri plants in 2025, from 5.6% of the state's 23,215 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 3rd largest of 137 plants in Missouri, the 185th largest of 14,327 in the U.S. and the 56th largest of 195 coal plants. By 2025 generation it is the 4th largest of 122 generating plants in the state.

New Madrid within Missouri, 2025
MeasureThis plantMissouriShare
Capacity (MW)1,30023,2155.6%
Generation (MWh)6,738,55271,443,0969.4%
Coal capacity (MW)1,3009,04814.4%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the New Madrid plant, and when do they retire?

2 operable generators total 1,300 MW, with an average age of 51 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s21,300100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal6501972n/a
2OperatingConventional Steam Coal6501977n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the New Madrid plant?

EIA lists no joint owners for New Madrid. Associated Electric Coop, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the New Madrid plant?

New Madrid is in New Madrid, New Madrid County, Missouri, at 36.5147° N, 89.5617° W. It sits in the Associated Electric Cooperative, Inc. balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Missouri are similar in size?

Missouri has 8 operable coal plants with 9,048 MW of capacity, and New Madrid's 1,300 MW is 14% of that.

Coal plants in Missouri around this size
PlantCountyMW2025 MWh
LabadieFranklin2,38916,719,646
IatanPlatte1,7545,717,960
New MadridNew Madrid1,3006,734,946
Thomas HillRandolph1,1826,930,829
SiouxSt Charles1,0993,982,167

Source: EIA Forms EIA-860 and EIA-923, 2025.