Ladysmith is a 893 MW natural gas power plant in Caroline County, Virginia, operated by Virginia Electric & Power Co, and it generated 992,525 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.9% of the generation reported in Virginia, and its capacity factor sits at the 39th percentile of U.S. natural gas plants. By 2025 generation it ranks 741st of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

893 MWNameplate capacity
12%Capacity factor, 2025, 39th percentile, on 789 MW net summer
0.9%Of VA generation, 2025
20 yearsAverage generator age, by MW

How hard does the Ladysmith plant run compared with other natural gas plants?

The Ladysmith plant had a capacity factor of 12% in 2025 on 789 MW of net summer capacity, the 39th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 45 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Ladysmith12%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Ladysmith plant generating more or less than last year?

Ladysmith generated 992,525 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 36.4% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024811,249
2025992,525
2026 through August427,561
2025, same months672,111
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202647,292
July 202690,401
June 202661,299
May 202641,366
April 202661,735
March 202618,298
February 202645,463
January 202661,707
December 202537,451
November 2025104,745
October 202562,770
September 2025115,448
August 2025116,590
July 2025221,238
June 202590,010
May 202536,688
April 202578,523
March 202518,387
February 202520,551
January 202590,124
December 20240
November 202413,253
October 2024100,379
September 2024122,726
August 202479,786
July 2024151,788
June 202483,740
May 2024122,076
April 202494,397
March 202416,177
February 20249,249
January 202417,678

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Ladysmith plant?

Ladysmith made 0.9% of the 106,220,859 MWh reported by Virginia plants in 2025, from 2.9% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 9th largest of 259 plants in Virginia, the 359th largest of 14,327 in the U.S. and the 190th largest of 1,962 natural gas plants. By 2025 generation it is the 17th largest of 241 generating plants in the state.

Ladysmith within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)89331,3122.9%
Generation (MWh)992,525106,220,8590.9%
Natural gas capacity (MW)89315,1025.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Ladysmith plant, and when do they retire?

5 operable generators total 893 MW, with an average age of 20 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s5893100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine1792001n/a
2OperatingNatural Gas Fired Combustion Turbine1792001n/a
3OperatingNatural Gas Fired Combustion Turbine1792008n/a
4OperatingNatural Gas Fired Combustion Turbine1792008n/a
5OperatingNatural Gas Fired Combustion Turbine1792009n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Ladysmith plant?

EIA lists no joint owners for Ladysmith. Virginia Electric & Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Virginia Electric & Power Co charge homes?

Virginia Electric & Power Co, the operator of Ladysmith, had an average residential price of 15.20¢ per kWh and an average bill of $158 a month in 2025, 1% below the Virginia average of 15.28¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Virginia
Virginia Electric & Power Co15.20¢$1581% lower
Virginia average15.28¢$163
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Ladysmith plant?

Ladysmith is in Woodford, Caroline County, Virginia, at 38.0722° N, 77.5133° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Virginia are similar in size?

Virginia has 30 operable natural gas plants with 15,102 MW of capacity, and Ladysmith's 893 MW is 6% of that.

Natural gas plants in Virginia around this size
PlantCountyMW2025 MWh
Brunswick County Power StationBrunswick1,4729,690,280
Doswell Energy CenterHanover1,3135,446,184
Tenaska Virginia Generating StationFluvanna1,0115,123,068
LadysmithCaroline893858,292
Potomac Energy Center, LLCLoudoun8124,742,336
RemingtonFauquier7061,224,496
Possum PointPrince William6132,796,933

Source: EIA Forms EIA-860 and EIA-923, 2025.