Remington is a 706 MW natural gas power plant in Fauquier County, Virginia, operated by Virginia Electric & Power Co, and it generated 1,269,192 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Virginia, and its capacity factor sits at the 51st percentile of U.S. natural gas plants. By 2025 generation it ranks 644th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

706 MWNameplate capacity
23%Capacity factor, 2025, 51st percentile, on 614 MW net summer
1.2%Of VA generation, 2025
25 yearsAverage generator age, by MW

How hard does the Remington plant run compared with other natural gas plants?

The Remington plant had a capacity factor of 23% in 2025 on 614 MW of net summer capacity, the 51st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 83 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Remington23%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Remington plant generating more or less than last year?

Generation at Remington rose 47.2% from 2024 to 2025, from 862,405 MWh to 1,269,192 MWh.

Net generation by period
PeriodMWh
2024862,405
20251,269,192
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 2025106,629
November 202586,463
October 202573,181
September 2025147,814
August 202589,476
July 2025226,695
June 2025141,255
May 202561,324
April 2025147,247
March 202578,664
February 202543,095
January 202567,347
December 202442,400
November 202439,654
October 202469,152
September 202480,366
August 2024118,347
July 2024195,007
June 202457,056
May 202497,055
April 2024122,212
March 202431,472
February 20243,364
January 20246,318

Source: EIA Form EIA-923, through August 2026.

How much of Virginia's electricity comes from the Remington plant?

Remington made 1.2% of the 106,220,859 MWh reported by Virginia plants in 2025, from 2.3% of the state's 31,312 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 13th largest of 259 plants in Virginia, the 486th largest of 14,327 in the U.S. and the 278th largest of 1,962 natural gas plants. By 2025 generation it is the 16th largest of 241 generating plants in the state.

Remington within Virginia, 2025
MeasureThis plantVirginiaShare
Capacity (MW)70631,3122.3%
Generation (MWh)1,269,192106,220,8591.2%
Natural gas capacity (MW)70615,1024.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Remington plant, and when do they retire?

4 operable generators total 706 MW, with an average age of 25 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s4706100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingNatural Gas Fired Combustion Turbine1792000n/a
2OperatingNatural Gas Fired Combustion Turbine1702000n/a
3OperatingNatural Gas Fired Combustion Turbine1792000n/a
4OperatingNatural Gas Fired Combustion Turbine1792000n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Remington plant?

EIA lists no joint owners for Remington. Virginia Electric & Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Virginia Electric & Power Co charge homes?

Virginia Electric & Power Co, the operator of Remington, had an average residential price of 15.20¢ per kWh and an average bill of $158 a month in 2025, 1% below the Virginia average of 15.28¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Virginia
Virginia Electric & Power Co15.20¢$1581% lower
Virginia average15.28¢$163
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Remington plant?

Remington is in Remington, Fauquier County, Virginia, at 38.5442° N, 77.7714° W. It sits in the PJM Interconnection, LLC balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Virginia are similar in size?

Virginia has 30 operable natural gas plants with 15,102 MW of capacity, and Remington's 706 MW is 5% of that.

Natural gas plants in Virginia around this size
PlantCountyMW2025 MWh
Tenaska Virginia Generating StationFluvanna1,0115,123,068
LadysmithCaroline893858,292
Potomac Energy Center, LLCLoudoun8124,742,336
RemingtonFauquier7061,224,496
Possum PointPrince William6132,796,933
Marsh Run Generation FacilityFauquier597648,630
Bear GardenBuckingham5593,367,324