Laredo is a 264 MW natural gas power plant in Webb County, Texas, operated by City of San Antonio-(TX), and it generated 24,064 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 12th percentile of U.S. natural gas plants. By 2025 generation it ranks 5,008th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

264 MWNameplate capacity
2%Capacity factor, 2025, 12th percentile, on 177 MW net summer
5,008thU.S. rank by generation, 2025
17 yearsAverage generator age, by MW

How hard does the Laredo plant run compared with other natural gas plants?

The Laredo plant had a capacity factor of 2% in 2025 on 177 MW of net summer capacity, the 12th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 6 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Laredo2%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Laredo plant generating more or less than last year?

Generation at Laredo fell 54.1% from 2024 to 2025, from 52,386 MWh to 24,064 MWh.

Net generation by period
PeriodMWh
202452,386
202524,064
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,918
November 20257,609
October 2025724
September 2025294
August 2025466
July 2025311
June 20250
May 20254,116
April 20252,927
March 20252,500
February 20251,324
January 20251,876
December 2024206
November 20245,696
October 202412,868
September 20242,390
August 20247,607
July 2024570
June 20246,682
May 202411,083
April 20242,723
March 20241,844
February 2024181
January 2024536

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Laredo plant?

Laredo made 0.0% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.1% of the state's 195,966 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 195th largest of 1,023 plants in Texas, the 1,194th largest of 14,327 in the U.S. and the 651st largest of 1,962 natural gas plants. By 2025 generation it is the 565th largest of 816 generating plants in the state.

Laredo within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)264195,9660.1%
Generation (MWh)24,064592,896,1760.0%
Natural gas capacity (MW)26481,5740.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Laredo plant, and when do they retire?

2 operable generators total 264 MW, with an average age of 17 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 3 have already retired, totalling 187 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2000s2264100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
4OperatingNatural Gas Fired Combustion Turbine1322008n/a
5OperatingNatural Gas Fired Combustion Turbine1322008n/a
1RetiredNatural Gas Steam Turbine3519512008
2RetiredNatural Gas Steam Turbine3819552008
3RetiredNatural Gas Steam Turbine11519752008

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Laredo plant?

EIA lists no joint owners for Laredo. City of San Antonio-(TX) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of San Antonio charge homes?

City of San Antonio, the operator of Laredo, had an average residential price of 12.40¢ per kWh and an average bill of $133 a month in 2025, 19% below the Texas average of 15.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Texas
City of San Antonio12.40¢$13319% lower
Texas average15.40¢$171
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Laredo plant?

Laredo is in Laredo, Webb County, Texas, at 27.5667° N, 99.5089° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Texas are similar in size?

Texas has 305 operable natural gas plants with 81,574 MW of capacity, and Laredo's 264 MW is 0% of that.

Natural gas plants in Texas around this size
PlantCountyMW2025 MWh
CFB Power PlantCalhoun310851,532
Johnson CountyJohnson2831,264,776
Paris Energy CenterLamar266320,433
LaredoWebb26424,064
Freeport Energy CenterBrazoria260847,653
Black Hawk StationHutchinson2441,189,295
Winchester Power ParkFayette24258,082