Natural gas power plant, Florida

Larsen Memorial natural gas power plant, Florida

Larsen Memorial is a 134 MW natural gas power plant in Polk County, Florida, operated by City of Lakeland-(FL), and it generated 159,175 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 37th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,811th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

134 MWNameplate capacity
11%Capacity factor, 2025, 37th percentile, on 163 MW net summer
0.1%Of FL generation, 2025
45 yearsAverage generator age, by MW

How hard does the Larsen Memorial plant run compared with other natural gas plants?

The Larsen Memorial plant had a capacity factor of 11% in 2025 on 163 MW of net summer capacity, the 37th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 40 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Larsen Memorial11%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Larsen Memorial plant generating more or less than last year?

Larsen Memorial generated 159,175 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024298,082
2025159,175
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20251,023
November 20252,192
October 20253,968
September 20259,944
August 202519,382
July 202522,662
June 20257,990
May 202540,933
April 202535,970
March 202512,871
February 2025600
January 20251,640
December 202429,184
November 202420,892
October 202410,782
September 202433,908
August 202451,176
July 202443,359
June 20240
May 20240
April 202442,732
March 202450,881
February 202415,168
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Larsen Memorial plant?

Larsen Memorial made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.2% of the state's 79,936 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 62nd largest of 331 plants in Florida, the 2,183rd largest of 14,327 in the U.S. and the 814th largest of 1,962 natural gas plants. By 2025 generation it is the 137th largest of 313 generating plants in the state.

Larsen Memorial within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)13479,9360.2%
Generation (MWh)159,175267,867,7350.1%
Natural gas capacity (MW)13452,8940.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Larsen Memorial plant, and when do they retire?

4 operable generators total 134 MW, with an average age of 45 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 25 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s12519%none reported
1960s22217%none reported
1990s18665%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
5OperatingNatural Gas Fired Combined Cycle251956n/a
2Out of serviceNatural Gas Fired Combustion Turbine111962n/a
3Out of serviceNatural Gas Fired Combustion Turbine111962n/a
8OperatingNatural Gas Fired Combined Cycle861992n/a
6RetiredNatural Gas Steam Turbine2519592003

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Larsen Memorial plant?

EIA lists no joint owners for Larsen Memorial. City of Lakeland-(FL) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Lakeland charge homes?

City of Lakeland, the operator of Larsen Memorial, had an average residential price of 11.73¢ per kWh and an average bill of $136 a month in 2025, 23% below the Florida average of 15.21¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Florida
City of Lakeland11.73¢$13623% lower
Florida average15.21¢$168
U.S. average17.23¢$15113% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Larsen Memorial plant?

Larsen Memorial is in Lakeland, Polk County, Florida, at 28.0491° N, 81.9238° W. It sits in the Florida Municipal Power Pool balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Larsen Memorial's 134 MW is 0% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Orange Cogeneration FacilityPolk157374,623
John R KellyAlachua142680,105
Larsen MemorialPolk134157,211
Suwannee RiverSuwannee13258,089
Mulberry Cogeneration FacilityPolk128291,116
Orlando Cogen LPOrange122347,968

Source: EIA Forms EIA-860 and EIA-923, 2025.