Natural gas power plant, Florida
Orlando Cogen LP natural gas power plant, Florida
Orlando Cogen LP is a 122 MW natural gas power plant in Orange County, Florida, operated by Florida Municipal Power Agency (FL), and it generated 347,968 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 60th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,777th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Orlando Cogen LP plant run compared with other natural gas plants?
The Orlando Cogen LP plant had a capacity factor of 33% in 2025 on 120 MW of net summer capacity, the 60th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 121 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Orlando Cogen LP | 33% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Orlando Cogen LP plant generating more or less than last year?
Orlando Cogen LP generated 347,968 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 704,752 |
| 2025 | 347,968 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 863 |
| November 2025 | 0 |
| October 2025 | 4,122 |
| September 2025 | 11,225 |
| August 2025 | 78,832 |
| July 2025 | 40,877 |
| June 2025 | 36,716 |
| May 2025 | 39,173 |
| April 2025 | 80,566 |
| March 2025 | 50,545 |
| February 2025 | 621 |
| January 2025 | 4,428 |
| December 2024 | 43,080 |
| November 2024 | 20,914 |
| October 2024 | 55,384 |
| September 2024 | 78,569 |
| August 2024 | 83,295 |
| July 2024 | 85,883 |
| June 2024 | 70,712 |
| May 2024 | 83,980 |
| April 2024 | 80,426 |
| March 2024 | 78,899 |
| February 2024 | 23,610 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Orlando Cogen LP plant, and when do they retire?
1 operable generator totals 122 MW, with an average age of 32 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1990s | 1 | 122 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| GEN1 | Operating | Natural Gas Fired Combined Cycle | 122 | 1993 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Orlando Cogen LP plant?
EIA lists no joint owners for Orlando Cogen LP. Florida Municipal Power Agency (FL) operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Orlando Cogen LP plant?
Orlando Cogen LP is in Orlando, Orange County, Florida, at 28.4426° N, 81.4123° W. It sits in the Progress Energy Florida balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Florida are similar in size?
Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Orlando Cogen LP's 122 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Larsen Memorial | Polk | 134 | 157,211 |
| Suwannee River | Suwannee | 132 | 58,089 |
| Mulberry Cogeneration Facility | Polk | 128 | 291,116 |
| Orlando Cogen LP | Orange | 122 | 347,968 |
| Pensacola Florida Plant | Escambia | 102 | 494,501 |
| South Tampa Resilience Project | Hillsborough | 75 | 22,609 |
Source: EIA Forms EIA-860 and EIA-923, 2025.