Natural gas power plant, Florida
South Tampa Resilience Project, Florida
South Tampa Resilience Project is a 75.2 MW natural gas power plant in Hillsborough County, Florida, operated by Tampa Electric Co, and it generated 22,609 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 19th percentile of U.S. natural gas plants. By 2025 generation it ranks 5,101st of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the South Tampa Resilience Project plant run compared with other natural gas plants?
The South Tampa Resilience Project plant had a capacity factor of 4% in 2025 on 72.8 MW of net summer capacity, the 19th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 13 days at full output out of 365.
0%Shaded: the middle half of natural gas plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| South Tampa Resilience Project | 4% |
| Natural gas plants, 75th percentile | 56% |
| Natural gas plants, median | 22% |
| Natural gas plants, 25th percentile | 6% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the South Tampa Resilience Project plant generating more or less than last year?
South Tampa Resilience Project generated 22,609 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 22,609 |
Monthly generation, Feb 2025 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 1,712 |
| November 2025 | 1,591 |
| October 2025 | 2,115 |
| September 2025 | 2,301 |
| August 2025 | 2,584 |
| July 2025 | 2,617 |
| June 2025 | 2,385 |
| May 2025 | 2,289 |
| April 2025 | 1,765 |
| March 2025 | 1,663 |
| February 2025 | 1,587 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the South Tampa Resilience Project plant, and when do they retire?
4 operable generators total 75.2 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 4 | 75 | 100% | none reported |
Every generator, 4 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| MPS01 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| MPS02 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| MPS03 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
| MPS04 | Operating | Natural Gas Internal Combustion Engine | 19 | 2025 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the South Tampa Resilience Project plant?
EIA lists no joint owners for South Tampa Resilience Project. Tampa Electric Co operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
What does Tampa Electric Co charge homes?
Tampa Electric Co, the operator of South Tampa Resilience Project, had an average residential price of 17.32¢ per kWh and an average bill of $194 a month in 2025, 14% above the Florida average of 15.21¢.
| Measure | Price | Monthly bill | Against Florida |
|---|---|---|---|
| Tampa Electric Co | 17.32¢ | $194 | 14% higher |
| Florida average | 15.21¢ | $168 | |
| U.S. average | 17.23¢ | $151 | 13% higher |
Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.
Where is the South Tampa Resilience Project plant?
South Tampa Resilience Project is in Tampa, Hillsborough County, Florida, at 27.8633° N, 82.5174° W. It sits in the Tampa Electric Company balancing area (NERC region SERC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which natural gas plants in Florida are similar in size?
Florida has 68 operable natural gas plants with 52,894 MW of capacity, and South Tampa Resilience Project's 75.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Mulberry Cogeneration Facility | Polk | 128 | 291,116 |
| Orlando Cogen LP | Orange | 122 | 347,968 |
| Pensacola Florida Plant | Escambia | 102 | 494,501 |
| South Tampa Resilience Project | Hillsborough | 75 | 22,609 |
| Tom G Smith | Palm Beach | 58 | -194 |
| University of Florida | Alachua | 54 | 388,153 |
| Tropicana Products Bradenton | Manatee | 47 | 195,364 |
Source: EIA Forms EIA-860 and EIA-923, 2025.