Tropicana Products Bradenton natural gas power plant, Florida

Tropicana Products Bradenton is a 46.8 MW natural gas power plant in Manatee County, Florida, operated by Tropicana Products Inc, and it generated 195,364 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Florida, and its capacity factor sits at the 87th percentile of U.S. natural gas plants. By 2025 generation it ranks 2,530th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

46.8 MWNameplate capacity
72%Capacity factor, 2025, 87th percentile, on 31 MW net summer
0.1%Of FL generation, 2025
35 yearsAverage generator age, by MW

How hard does the Tropicana Products Bradenton plant run compared with other natural gas plants?

The Tropicana Products Bradenton plant had a capacity factor of 72% in 2025 on 31 MW of net summer capacity, the 87th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 263 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Tropicana Products Bradenton72%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Tropicana Products Bradenton plant generating more or less than last year?

Generation at Tropicana Products Bradenton rose 26.7% from 2024 to 2025, from 154,205 MWh to 195,364 MWh.

Net generation by period
PeriodMWh
2024154,205
2025195,364
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202513,685
November 202512,718
October 202516,906
September 202518,396
August 202520,655
July 202520,924
June 202519,064
May 202518,294
April 202514,113
March 202513,298
February 202512,683
January 202514,627
December 202410,212
November 202411,521
October 202413,233
September 202415,501
August 202415,930
July 202416,146
June 202414,541
May 202414,409
April 202410,618
March 202411,294
February 20249,593
January 202411,207

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from the Tropicana Products Bradenton plant?

Tropicana Products Bradenton made 0.1% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 240th largest of 331 plants in Florida, the 3,936th largest of 14,327 in the U.S. and the 1,116th largest of 1,962 natural gas plants. By 2025 generation it is the 65th largest of 313 generating plants in the state.

Tropicana Products Bradenton within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)4779,9360.1%
Generation (MWh)195,364267,867,7350.1%
Natural gas capacity (MW)4752,8940.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Tropicana Products Bradenton plant, and when do they retire?

1 operable generator totals 46.8 MW, with an average age of 35 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1990s147100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Fired Combustion Turbine471990n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Tropicana Products Bradenton plant?

EIA lists no joint owners for Tropicana Products Bradenton. Tropicana Products Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Tropicana Products Bradenton plant?

Tropicana Products Bradenton is in Bradenton, Manatee County, Florida, at 27.4834° N, 82.5483° W. It sits in the Florida Power & Light Company balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Tropicana Products Bradenton's 46.8 MW is 0% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
South Tampa Resilience ProjectHillsborough7522,609
Tom G SmithPalm Beach58-194
University of FloridaAlachua54388,153
Tropicana Products BradentonManatee47195,364
G W IveyMiami Dade34-4,084
Seminole MillDuval30150,119

Source: EIA Forms EIA-860 and EIA-923, 2025.