Natural gas power plant, Florida

Pensacola Florida Plant, Florida

Pensacola Florida Plant is a 102 MW natural gas power plant in Escambia County, Florida, operated by Ascend Performance Materials LLC, and it generated 494,524 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Florida, and its capacity factor sits at the 76th percentile of U.S. natural gas plants. By 2025 generation it ranks 1,352nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

102 MWNameplate capacity
58%Capacity factor, 2025, 76th percentile, on 98 MW net summer
0.2%Of FL generation, 2025
38 yearsAverage generator age, by MW

How hard does Pensacola Florida Plant run compared with other natural gas plants?

Pensacola Florida Plant had a capacity factor of 58% in 2025 on 98 MW of net summer capacity, the 76th percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 210 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Pensacola Florida Plant58%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is Pensacola Florida Plant generating more or less than last year?

Generation at Pensacola Florida Plant rose 10.0% from 2024 to 2025, from 449,381 MWh to 494,524 MWh. Through August 2026 it is running 10.9% behind the same months of 2025.

Net generation by period
PeriodMWh
2024449,381
2025494,524
2026 through August297,105
2025, same months333,387
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202638,447
July 202628,542
June 202631,827
May 202640,747
April 202638,550
March 202638,544
February 202642,309
January 202638,139
December 202542,078
November 202540,725
October 202539,925
September 202538,410
August 202536,097
July 202546,755
June 202544,080
May 202542,145
April 202540,856
March 202543,496
February 202538,713
January 202541,243
December 202435,274
November 202442,073
October 202432,585
September 202445,717
August 202440,027
July 202450,542
June 202444,942
May 202449,720
April 202446,279
March 202446,763
February 202410,553
January 20244,906

Source: EIA Form EIA-923, through August 2026.

How much of Florida's electricity comes from Pensacola Florida Plant?

Pensacola Florida Plant made 0.2% of the 267,867,735 MWh reported by Florida plants in 2025, from 0.1% of the state's 79,936 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 72nd largest of 331 plants in Florida, the 2,550th largest of 14,327 in the U.S. and the 892nd largest of 1,962 natural gas plants. By 2025 generation it is the 44th largest of 313 generating plants in the state.

Pensacola Florida Plant within Florida, 2025
MeasureThis plantFloridaShare
Capacity (MW)10279,9360.1%
Generation (MWh)494,524267,867,7350.2%
Natural gas capacity (MW)10252,8940.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at Pensacola Florida Plant, and when do they retire?

4 operable generators total 102 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1950s31616%none reported
1990s18684%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
GEN1OperatingNatural Gas Steam Turbine51953n/a
GEN2OperatingNatural Gas Steam Turbine51957n/a
GEN3OperatingNatural Gas Steam Turbine61958n/a
GEN4OperatingNatural Gas Fired Combustion Turbine861993n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns Pensacola Florida Plant?

EIA lists no joint owners for Pensacola Florida Plant. Ascend Performance Materials LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is Pensacola Florida Plant?

Pensacola Florida Plant is in Cantonment, Escambia County, Florida, at 30.5958° N, 87.2525° W. It sits in the Southern Company Services, Inc. - Trans balancing area (NERC region SERC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in Florida are similar in size?

Florida has 68 operable natural gas plants with 52,894 MW of capacity, and Pensacola Florida Plant's 102 MW is 0% of that.

Natural gas plants in Florida around this size
PlantCountyMW2025 MWh
Suwannee RiverSuwannee13258,089
Mulberry Cogeneration FacilityPolk128291,116
Orlando Cogen LPOrange122347,968
Pensacola Florida PlantEscambia102494,501
South Tampa Resilience ProjectHillsborough7522,609
Tom G SmithPalm Beach58-194
University of FloridaAlachua54388,153

Source: EIA Forms EIA-860 and EIA-923, 2025.