LCEC Generation LLVC is a 46.5 MW natural gas power plant in Lea County, New Mexico, operated by Western Farmers Elec Coop, Inc, and it generated 85,667 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in New Mexico, and its capacity factor sits at the 51st percentile of U.S. natural gas plants. By 2025 generation it ranks 3,574th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

46.5 MWNameplate capacity
22%Capacity factor, 2025, 51st percentile, on 43.5 MW net summer
0.2%Of NM generation, 2025
13 yearsAverage generator age, by MW

How hard does the LCEC Generation LLVC plant run compared with other natural gas plants?

The LCEC Generation LLVC plant had a capacity factor of 22% in 2025 on 43.5 MW of net summer capacity, the 51st percentile of the 1,236 U.S. natural gas plants with at least 20 MW. The typical natural gas plant reached 22%. That equals about 82 days at full output out of 365.

0%Shaded: the middle half of natural gas plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
LCEC Generation LLVC22%
Natural gas plants, 75th percentile56%
Natural gas plants, median22%
Natural gas plants, 25th percentile6%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the LCEC Generation LLVC plant generating more or less than last year?

Generation at LCEC Generation LLVC fell 14.9% from 2024 to 2025, from 100,664 MWh to 85,667 MWh.

Net generation by period
PeriodMWh
2024100,664
202585,667
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20257,627
November 20255,942
October 20256,837
September 20258,445
August 20258,139
July 20258,036
June 20257,556
May 20256,292
April 20256,751
March 20256,893
February 20254,618
January 20258,531
December 20248,922
November 20244,870
October 20245,816
September 20247,501
August 20249,188
July 202411,293
June 202410,080
May 20248,872
April 20246,711
March 20248,434
February 20249,233
January 20249,745

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the LCEC Generation LLVC plant?

LCEC Generation LLVC made 0.2% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.3% of the state's 13,801 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 59th largest of 161 plants in New Mexico, the 3,943rd largest of 14,327 in the U.S. and the 1,121st largest of 1,962 natural gas plants. By 2025 generation it is the 56th largest of 151 generating plants in the state.

LCEC Generation LLVC within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)4713,8010.3%
Generation (MWh)85,66739,178,2460.2%
Natural gas capacity (MW)473,6531.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the LCEC Generation LLVC plant, and when do they retire?

5 operable generators total 46.5 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s547100%none reported
Every generator, 5 in all
UnitStatusTechnologyMWIn servicePlanned retirement
UNIT1OperatingNatural Gas Internal Combustion Engine92012n/a
UNIT2OperatingNatural Gas Internal Combustion Engine92012n/a
UNIT3OperatingNatural Gas Internal Combustion Engine92012n/a
UNIT4OperatingNatural Gas Internal Combustion Engine92012n/a
UNIT5OperatingNatural Gas Internal Combustion Engine92012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the LCEC Generation LLVC plant?

EIA lists no joint owners for LCEC Generation LLVC. Western Farmers Elec Coop, Inc operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the LCEC Generation LLVC plant?

LCEC Generation LLVC is in Lovington, Lea County, New Mexico, at 32.9781° N, 103.3239° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which natural gas plants in New Mexico are similar in size?

New Mexico has 18 operable natural gas plants with 3,653 MW of capacity, and LCEC Generation LLVC's 46.5 MW is 1% of that.

Natural gas plants in New Mexico around this size
PlantCountyMW2025 MWh
Lordsburg GeneratingHidalgo8865,782
BluffviewSan Juan86411,510
Chino MinesGrant54205,445
LCEC Generation LLVCLea4785,667
AlgodonesSandoval45n/a
La Luz Energy CenterValencia4214,915

Source: EIA Forms EIA-860 and EIA-923, 2025.