NM power plants
Power plants in New Mexico
New Mexico has 161 operable power plants with 13.8 GW of nameplate capacity (Form EIA-860, 2025). The largest is Four Corners, at 1,636 MW, and wind has the most capacity, 32% of the state total.
What fuels do New Mexico's power plants use?
Wind makes up 32% of New Mexico's capacity, and natural gas 26%. The largest share of 2025 generation came from wind, at 36.4%.
| Fuel | Plants | Capacity | Share | 2025 MWh | Share |
|---|---|---|---|---|---|
| Wind | 29 | 4,430 MW | 32.1% | 14,271,135 | 36.4% |
| Natural gas | 18 | 3,654 MW | 26.5% | 10,320,819 | 26.3% |
| Solar | 101 | 3,472 MW | 25.2% | 6,183,184 | 15.8% |
| Coal | 1 | 1,636 MW | 11.9% | 8,239,233 | 21.0% |
| Battery and pumped storage | 5 | 475 MW | 3.4% | -37,253 | -0.1% |
| Hydro | 4 | 81.5 MW | 0.6% | 125,049 | 0.3% |
| Petroleum | 1 | 27 MW | 0.2% | 42 | 0.0% |
| Geothermal | 1 | 19.2 MW | 0.1% | 58,113 | 0.1% |
| Biomass | 1 | 6.6 MW | 0.0% | 17,924 | 0.0% |
Source: EIA Forms EIA-860 and EIA-923, 2025.
What power plants are in New Mexico?
The 10 largest of New Mexico's 161 plants hold 41% of its capacity, and half of the plants are 10.1 MW or smaller.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Four Corners | Coal | San Juan | 1,636 | 8,239,233 |
| Hobbs Generating Station | Natural gas | Lea | 682 | 3,284,123 |
| Luna Energy Facility | Natural gas | Luna | 650 | 1,662,177 |
| Sagamore Wind | Wind | Roosevelt | 522 | 2,112,918 |
| Arroyo Solar Energy Storage Hybrid | Solar | McKinley | 450 | 678,974 |
| Cunningham | Natural gas | Lea | 444 | 1,792,031 |
| Red Cloud Wind LLC | Wind | Lincoln | 350 | 1,179,142 |
| Rio Grande | Natural gas | Dona Ana | 348 | 789,889 |
| Clines Corners Wind Farm LLC | Wind | Torrance | 325 | 1,061,779 |
| La Joya NM | Wind | Torrance | 306 | 905,759 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 1 to 10 run from 1,636 MW at Four Corners to 306 MW at La Joya NM.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| San Juan Solar I | Solar | San Juan | 300 | 484,488 |
| Atrisco Energy Storage | Battery and pumped storage | Bernalillo | 300 | -34,669 |
| Atrisco Solar LLC | Solar | Bernalillo | 300 | 717,749 |
| El Cabo Wind | Wind | Torrance | 298 | 1,058,198 |
| Afton Generating Station | Natural gas | Dona Ana | 287 | 460,051 |
| Tecolote Wind LLC | Wind | Lincoln | 272 | 868,802 |
| Roosevelt County | Wind | Roosevelt | 250 | 983,873 |
| Oso Grande Wind Farm | Wind | Lea | 250 | 550,765 |
| Sky Ranch Solar | Solar | Valencia | 240 | 500,482 |
| Aragonne Wind LLC | Wind | Guadalupe | 235 | 614,629 |
| Milagro Solar I | Solar | Dona Ana | 225 | 279,072 |
| Grady Wind Energy Center, LLC | Wind | Curry | 221 | 804,812 |
| Maddox | Natural gas | Lea | 212 | 571,910 |
| New Mexico Wind Energy Center | Wind | Quay | 204 | 502,918 |
| Escalante (NM) | Solar | McKinley | 200 | 526,335 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 11 to 25 run from 300 MW at San Juan Solar I to 200 MW at Escalante (NM).
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| TAG | Solar | Sandoval | 198 | 93,269 |
| Shallow Basket | Solar | Rio Arriba | 190 | 137,036 |
| Pyramid | Natural gas | Hidalgo | 186 | 266,614 |
| Broadview Energy JN, LLC | Wind | Curry | 182 | 669,264 |
| Buena Vista Energy Center | Solar | Otero | 170 | 387,717 |
| Valencia Energy Facility | Natural gas | Valencia | 160 | 147,133 |
| Reeves | Natural gas | Bernalillo | 154 | 167,095 |
| Rio Bravo | Natural gas | Bernalillo | 150 | 287,613 |
| Broadview Energy KW, LLC | Wind | Curry | 143 | 530,944 |
| San Juan Mesa Wind Project LLC | Wind | Roosevelt | 120 | 250,501 |
| Duran Mesa LLC | Wind | Lincoln | 105 | 362,167 |
| Red Mesa Wind LLC | Wind | Sandoval | 102 | 163,235 |
| Caprock Wind Farm | Wind | Quay | 100 | 378,712 |
| High Lonesome Mesa LLC | Wind | Torrance | 100 | 313,427 |
| Borderlands Wind, LLC | Wind | Catron | 100 | 252,062 |
| Quail Ranch Solar and BESS | Solar | Bernalillo | 100 | 31,455 |
| Sky Ranch BESS II | Battery and pumped storage | Valencia | 100 | -2,997 |
| Lordsburg Generating | Natural gas | Hidalgo | 88 | 65,782 |
| Bluffview | Natural gas | San Juan | 85.8 | 411,510 |
| Chaves Solar, LLC | Solar | Chaves | 70 | 154,745 |
| Roswell Solar, LLC | Solar | Chaves | 70 | 153,135 |
| Jicarilla Solar 1 LLC | Solar | Rio Arriba | 70 | 106,985 |
| Macho Springs | Solar | Luna | 55 | 124,218 |
| Encino Solar Energy Center | Solar | Sandoval | 55 | 142,990 |
| Chino Mines | Natural gas | Grant | 54 | 205,445 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 26 to 50 run from 198 MW at TAG to 54 MW at Chino Mines.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Casa Mesa Wind Energy Center Hybrid | Wind | Quay | 51.9 | 180,024 |
| Macho Springs Power I | Wind | Luna | 50.4 | 115,304 |
| Milo Wind Project LLC | Wind | Roosevelt | 50 | 183,452 |
| Britton Solar Energy Center | Solar | Torrance | 50 | 140,936 |
| Jicarilla Solar 2 | Solar | Rio Arriba | 50 | 127,578 |
| NMRD Data Center III, LLC | Solar | Sandoval | 50 | 135,624 |
| Route 66 Energy Center, LLC | Solar | Cibola | 49.5 | 131,985 |
| Route 66 Energy Storage | Battery and pumped storage | Cibola | 49.5 | 0 |
| LCEC Generation LLVC | Natural gas | Lea | 46.5 | 85,667 |
| Algodones | Natural gas | Sandoval | 45 | n/a |
| La Luz Energy Center | Natural gas | Valencia | 42.3 | 14,915 |
| Cimarron Solar Facility | Solar | Colfax | 30.6 | 60,272 |
| Navajo Dam | Hydro | San Juan | 30 | 88,327 |
| Chaves County Solar II | Solar | Chaves | 30 | 70,717 |
| Sterling I Wind Farm | Wind | Lea | 29.9 | 111,108 |
| Alta Luna | Solar | Luna | 28.1 | 11,030 |
| Elephant Butte | Hydro | Sierra | 27.9 | 16,624 |
| Taos Mesa Energy Facility Hybrid | Solar | Taos | 27.5 | 36,400 |
| Wildcat Wind | Wind | Lea | 27.3 | 55,110 |
| Quay County | Petroleum | Quay | 27 | 42 |
| Caprock Solar 1 LLC | Solar | Quay | 25 | 56,965 |
| Kit Carson Co-Op | Battery and pumped storage | Taos | 23.7 | 0 |
| Roadrunner Solar | Solar | Dona Ana | 20.2 | 47,034 |
| Hayhurst New Mexico Solar | Solar | Eddy | 20 | 56,643 |
| Lightning Dock Geothermal | Geothermal | Hidalgo | 19.2 | 58,113 |
| Abiquiu Dam | Hydro | Rio Arriba | 15.6 | 15,737 |
| Ford Utilities Center | Natural gas | Bernalillo | 14.8 | 77,481 |
| SunE EPE2 LLC | Solar | Dona Ana | 12 | 26,429 |
| Angel Fire Energy Facility | Solar | Colfax | 11.2 | 14,753 |
| Santolina Solar Energy Center | Solar | Bernalillo | 10.5 | 26,775 |
| SPS4 Monument | Solar | Lea | 10.1 | 21,854 |
| SPS5 Hopi | Solar | Eddy | 10.1 | 20,804 |
| SPS1 Dollarhide | Solar | Lea | 10 | 22,468 |
| SPS2 Jal | Solar | Lea | 10 | 21,842 |
| SPS3 Lea | Solar | Lea | 10 | 22,713 |
| SunE EPE1 LLC | Solar | Dona Ana | 10 | 26,161 |
| Anderson Wind II | Wind | Chaves | 10 | 29,992 |
| South Valley Solar Energy Center | Solar | Bernalillo | 10 | 26,523 |
| Rio Communities Solar Energy Center | Solar | Valencia | 10 | 23,371 |
| Facebook 1 Solar Energy Center | Solar | Valencia | 10 | 23,000 |
| Facebook 2 Solar Energy Center | Solar | Bernalillo | 10 | 27,694 |
| Facebook 3 Solar Energy Center | Solar | Bernalillo | 10 | 27,728 |
| Vista Solar Energy Center | Solar | Valencia | 10 | 27,669 |
| Rio De Oro Solar Energy Center | Solar | Valencia | 10 | 28,274 |
| San Miguel I Solar Energy Center | Solar | San Miguel | 10 | 26,318 |
| San Miguel II Solar Energy Center | Solar | San Miguel | 10 | 26,625 |
| Rio Rancho Solar Energy Center | Solar | Bernalillo | 10 | 27,472 |
| Broadview Energy Prime | Wind | Curry | 9.9 | 12,850 |
| Broadview Energy Prime 2 | Wind | Curry | 9.9 | 9,771 |
| Santa Fe Solar Energy Center | Solar | Santa Fe | 9.5 | 24,144 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 51 to 100 run from 51.9 MW at Casa Mesa Wind Energy Center Hybrid to 9.5 MW at Santa Fe Solar Energy Center.
| Plant | Fuel | County | MW | 2025 MWh |
|---|---|---|---|---|
| Meadow Lake Solar Energy Center | Solar | Valencia | 9.1 | 22,953 |
| Deming Solar Energy Center | Solar | Luna | 9 | 20,100 |
| Manzano Solar | Solar | Valencia | 8.4 | 18,232 |
| El Vado Dam | Hydro | Rio Arriba | 8 | 4,361 |
| Otero Solar | Solar | Otero | 8 | 17,574 |
| City of Gallup Solar | Solar | McKinley | 8 | 12,665 |
| Cibola | Solar | Cibola | 7.6 | 19,544 |
| Los Lunas Solar Energy Center | Solar | Valencia | 7 | 15,265 |
| Southside Water Reclamation Plant | Biomass | Bernalillo | 6.6 | 17,924 |
| Sandoval Solar Energy Center | Solar | Sandoval | 6.1 | 15,711 |
| Las Vegas Solar Energy Center | Solar | San Miguel | 5 | 8,968 |
| Alamogordo Solar Energy Center | Solar | Otero | 5 | 11,110 |
| Hatch Solar Energy Center I, LLC | Solar | Dona Ana | 5 | 10,496 |
| Anderson Wind I | Wind | Chaves | 5 | 9,617 |
| Holloman Solar Facility | Solar | Otero | 5 | 4,296 |
| Middle Daisy | Solar | Lea | 5 | 9,397 |
| ASG-4 Community Solar | Solar | Valencia | 5 | 184 |
| ASG-8 | Solar | Valencia | 5 | 2,142 |
| ASG-2 Community Solar | Solar | Sandoval | 5 | 165 |
| SLO-1 Community Solar | Solar | Valencia | 5 | 705 |
| SLO-3 Community Solar | Solar | Dona Ana | 5 | 55 |
| Pluma - Pino | Solar | San Miguel | 5 | 606 |
| Emi NM Bent Bow | Solar | Dona Ana | 5 | 440 |
| Pluma - SLT Las Cruces | Solar | Dona Ana | 5 | 751 |
| New Mexico State University | Natural gas | Dona Ana | 4.7 | 31,383 |
| Grants CDEC 2 | Solar | Cibola | 4.5 | 11,461 |
| WSMR I | Solar | Dona Ana | 4.1 | n/a |
| NMSU Solar and Storage | Solar | Dona Ana | 4 | n/a |
| Syncarpha Taos | Solar | Taos | 3.1 | 7,635 |
| Carrizozo Solar | Solar | Lincoln | 3 | 5,800 |
| Pluma - Curry Road North | Solar | Curry | 3 | 186 |
| Netflix ABQ System A | Solar | Bernalillo | 2.6 | 87 |
| Cuba 2.5ac, LLC | Solar | Sandoval | 2.5 | 5,764 |
| Bluewater CDEC 1 | Solar | Cibola | 2.4 | 6,597 |
| Alcalde Solar Array | Solar | Rio Arriba | 2.4 | 5,923 |
| GSE NM1 | Solar | Chaves | 2.3 | 4,463 |
| Albuquerque Solar Energy Center | Solar | Bernalillo | 2 | 4,075 |
| SEV NM Phase 2 | Solar | Chaves | 2 | 4,032 |
| Eubank Landfill Solar Array | Solar | Bernalillo | 2 | n/a |
| CNMEC Solar Energy Center | Solar | Torrance | 2 | 5,486 |
| SoCore Clovis 1 | Solar | Curry | 2 | 4,603 |
| Netflix ABQ System B | Solar | Bernalillo | 2 | 116 |
| City of Truth or Consequences PV | Solar | Sierra | 1.9 | 1,447 |
| Columbus Solar Project | Solar | Luna | 1.9 | 5,199 |
| Syncarpha El Rito | Solar | Rio Arriba | 1.6 | 3,456 |
| Syncarpha Questa | Solar | Taos | 1.6 | 3,729 |
| Mesalands Comm College Wind Turbine | Wind | Quay | 1.5 | 0 |
| Storrie Lake Solar Project | Solar | San Miguel | 1.5 | 2,344 |
| Kit Carson | Solar | Taos | 1.3 | 2,569 |
| Blue Sky One | Solar | Taos | 1.3 | 2,714 |
| Prosperity Energy Storage Facility Hybri | Battery and pumped storage | Bernalillo | 1.3 | 413 |
| City of Rio Rancho WWTP | Solar | Sandoval | 1.2 | 2,703 |
| Questa Solar Facility | Solar | Taos | 1 | 1,311 |
| Los Alamos PV Site | Solar | Los Alamos | 1 | 0 |
| Silver City WWTP PV Project | Solar | Grant | 1 | 1,978 |
| Sue Cleveland High School | Solar | Sandoval | 1 | 2,254 |
| Rio Rancho High School | Solar | Sandoval | 1 | 2,178 |
| Springer Solar 1 | Solar | Colfax | 1 | 2,171 |
| Wal-Mart Truth or Consequences PV | Solar | Sierra | 1 | 1,603 |
| Syncarpha Eagle Nest | Solar | Colfax | 1 | 1,985 |
| RC Energy AA LLC Solar Facility | Solar | Bernalillo | 1 | 1,505 |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity is nameplate of operable generators. Ranks 101 to 161 run from 9.1 MW at Meadow Lake Solar Energy Center to 1 MW at RC Energy AA LLC Solar Facility.
Which New Mexico plants are not running?
54 more sites in New Mexico have no operable generators in 2025: proposed projects, retired plants and sites still on file.
Show 54 sites without operable generators
| Site | County | Proposed | Retired |
|---|---|---|---|
| SunZia Wind South | Lincoln | 2,561 MW | n/a |
| NTEC Gas Plant | San Juan | 1,089 MW | n/a |
| SunZia Wind North | Torrance | 1,089 MW | n/a |
| Santa Teresa Solar | Dona Ana | 300 MW | n/a |
| Foxtail Flats Solar, LLC | San Juan | 250 MW | n/a |
| AC Ranch II | Lea | 230 MW | n/a |
| Tip Top Solar Energy Center LLC | Lea | 220 MW | n/a |
| Blackwater Solar Center - NM | Roosevelt | 200 MW | n/a |
| Buena Vista Energy Center III | Otero | 200 MW | n/a |
| Four Mile Mesa Solar, LLC | San Juan | 200 MW | n/a |
| Star Light Energy Center | Valencia | 200 MW | n/a |
| Cunningham Solar II | Lea | 196 MW | n/a |
| Gallegos Wind Farm, Phase 1 | Union | 190 MW | n/a |
| Windy Lane Energy Center | De Baca | 158 MW | n/a |
| Corazon Energy Storage | Bernalillo | 150 MW | n/a |
| Wildcat Solar Power Plant LLC | McKinley | 140 MW | n/a |
| Carne Energy Storage, LLC | Luna | 130 MW | n/a |
| Rockmont Solar and Storage Project | San Juan | 130 MW | n/a |
| Solar PV Development NM 18 II LLC | Luna | 130 MW | n/a |
| Cunningham Solar I & BESS | Lea | 108 MW | n/a |
| Oso Negro | Bernalillo | 100 MW | n/a |
| AC Ranch I | Lea | 75 MW | n/a |
| Sandia Energy Center | Bernalillo | 60 MW | n/a |
| Westside - (NM) | San Juan | 60 MW | n/a |
| Juniper Sol Solar CSG | Santa Fe | 5 MW | n/a |
| Pluma - Reynolds (CSG) | Otero | 5 MW | n/a |
| SLO-2 | Sandoval | 5 MW | n/a |
| USS Jornada Solar | Dona Ana | 5 MW | n/a |
| XCEL-1 Community Solar | Chaves | 5 MW | n/a |
| Pluma - SLT Grant | Grant | 4.8 MW | n/a |
| USS Gold Solar | Luna | 4.3 MW | n/a |
| Rockhound Sol Solar CSG | Luna | 4 MW | n/a |
| Pluma - SLT Hidalgo CSG | Hidalgo | 3.8 MW | n/a |
| Pluma - Clovis Concrete North CSG | Curry | 3.4 MW | n/a |
| USS Hermanas Solar | Luna | 3.3 MW | n/a |
| USS Meadow Lake Solar | Valencia | 3 MW | n/a |
| USS Fletcher Solar | Hidalgo | 1.7 MW | n/a |
| San Juan | San Juan | n/a | 1,848 MW |
| Escalante | McKinley | n/a | 257 MW |
| Milagro Cogeneration Plant | San Juan | n/a | 122 MW |
| Animas | San Juan | n/a | 50.3 MW |
| Freeport McMoRan | Grant | n/a | 45.4 MW |
| Las Vegas | San Miguel | n/a | 20 MW |
| Carlsbad | Eddy | n/a | 16.3 MW |
| Tucumcari | Quay | n/a | 16.1 MW |
| Nodal Power | Dona Ana | n/a | 3.2 MW |
| Blanco Compressor Station | San Juan | n/a | 3 MW |
| Univ New Mexico Cogen Plant | Bernalillo | n/a | 2.5 MW |
| Aragonne Mesa Phase II | Guadalupe | n/a | n/a |
| Caprock Solar 2 LLC | Quay | n/a | n/a |
| Eddy County Generating Station | Eddy | n/a | n/a |
| New Mexico Community Solar Facility | Dona Ana | n/a | n/a |
| Pasilla Solar and Battery Storage | Lea | n/a | n/a |
| Pinon Energy Center | San Juan | n/a | n/a |
Source: EIA Form EIA-860, 2025 final.