Solar power plant, New Mexico
Roadrunner Solar power plant, New Mexico
Roadrunner Solar is a 20.2 MW solar power plant in Dona Ana County, New Mexico, operated by NRG Solar Roadrunner, and it generated 47,034 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New Mexico, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 4,174th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Roadrunner Solar plant run compared with other solar plants?
The Roadrunner Solar plant had a capacity factor of 27% in 2025 on 20 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Roadrunner Solar | 27% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Roadrunner Solar plant generating more or less than last year?
Generation at Roadrunner Solar rose 1.2% from 2024 to 2025, from 46,468 MWh to 47,034 MWh.
| Period | MWh |
|---|---|
| 2024 | 46,468 |
| 2025 | 47,034 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 2,582 |
| November 2025 | 2,879 |
| October 2025 | 3,578 |
| September 2025 | 3,771 |
| August 2025 | 4,458 |
| July 2025 | 4,683 |
| June 2025 | 5,079 |
| May 2025 | 5,380 |
| April 2025 | 4,683 |
| March 2025 | 3,995 |
| February 2025 | 3,187 |
| January 2025 | 2,759 |
| December 2024 | 2,493 |
| November 2024 | 2,809 |
| October 2024 | 3,694 |
| September 2024 | 4,187 |
| August 2024 | 4,531 |
| July 2024 | 4,401 |
| June 2024 | 4,930 |
| May 2024 | 5,623 |
| April 2024 | 4,597 |
| March 2024 | 3,771 |
| February 2024 | 2,730 |
| January 2024 | 2,702 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Roadrunner Solar plant, and when do they retire?
1 operable generator totals 20.2 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2010s | 1 | 20 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Solar Photovoltaic | 20 | 2011 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Roadrunner Solar plant?
EIA lists no joint owners for Roadrunner Solar. NRG Solar Roadrunner operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Roadrunner Solar plant?
Roadrunner Solar is in Santa Teresa, Dona Ana County, New Mexico, at 31.7928° N, 106.6733° W. It sits in the El Paso Electric Company balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in New Mexico are similar in size?
New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Roadrunner Solar's 20.2 MW is 1% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Chaves County Solar II | Chaves | 30 | 70,717 |
| Alta Luna | Luna | 28 | 11,030 |
| Caprock Solar 1 LLC | Quay | 25 | 56,965 |
| Roadrunner Solar | Dona Ana | 20 | 47,034 |
| Hayhurst New Mexico Solar | Eddy | 20 | 56,643 |
| Taos Mesa Energy Facility Hybrid | Taos | 15 | 37,559 |
| SunE EPE2 LLC | Dona Ana | 12 | 26,429 |
Source: EIA Forms EIA-860 and EIA-923, 2025.