Roadrunner Solar power plant, New Mexico

Roadrunner Solar is a 20.2 MW solar power plant in Dona Ana County, New Mexico, operated by NRG Solar Roadrunner, and it generated 47,034 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New Mexico, and its capacity factor sits at the 77th percentile of U.S. solar plants. By 2025 generation it ranks 4,174th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20.2 MWNameplate capacity
27%Capacity factor, 2025, 77th percentile, on 20 MW net summer
0.1%Of NM generation, 2025
14 yearsAverage generator age, by MW

How hard does the Roadrunner Solar plant run compared with other solar plants?

The Roadrunner Solar plant had a capacity factor of 27% in 2025 on 20 MW of net summer capacity, the 77th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 98 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Roadrunner Solar27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Roadrunner Solar plant generating more or less than last year?

Generation at Roadrunner Solar rose 1.2% from 2024 to 2025, from 46,468 MWh to 47,034 MWh.

Net generation by period
PeriodMWh
202446,468
202547,034
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20252,582
November 20252,879
October 20253,578
September 20253,771
August 20254,458
July 20254,683
June 20255,079
May 20255,380
April 20254,683
March 20253,995
February 20253,187
January 20252,759
December 20242,493
November 20242,809
October 20243,694
September 20244,187
August 20244,531
July 20244,401
June 20244,930
May 20245,623
April 20244,597
March 20243,771
February 20242,730
January 20242,702

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Roadrunner Solar plant?

Roadrunner Solar made 0.1% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.1% of the state's 13,801 MW of capacity. By capacity it is the 73rd largest of 161 plants in New Mexico, the 4,769th largest of 14,327 in the U.S. and the 1,077th largest of 7,223 solar plants. By 2025 generation it is the 65th largest of 151 generating plants in the state.

Roadrunner Solar within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)2013,8010.1%
Generation (MWh)47,03439,178,2460.1%
Solar capacity (MW)202,9020.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Roadrunner Solar plant, and when do they retire?

1 operable generator totals 20.2 MW, with an average age of 14 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingSolar Photovoltaic202011n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Roadrunner Solar plant?

EIA lists no joint owners for Roadrunner Solar. NRG Solar Roadrunner operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Roadrunner Solar plant?

Roadrunner Solar is in Santa Teresa, Dona Ana County, New Mexico, at 31.7928° N, 106.6733° W. It sits in the El Paso Electric Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Roadrunner Solar's 20.2 MW is 1% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Chaves County Solar IIChaves3070,717
Alta LunaLuna2811,030
Caprock Solar 1 LLCQuay2556,965
Roadrunner SolarDona Ana2047,034
Hayhurst New Mexico SolarEddy2056,643
Taos Mesa Energy Facility HybridTaos1537,559
SunE EPE2 LLCDona Ana1226,429

Source: EIA Forms EIA-860 and EIA-923, 2025.