Taos Mesa Energy Facility Hybrid is a 27.5 MW power plant, 15 MW of it solar, in Taos County, New Mexico, operated by Taos Mesa Energy Facility, LLC, and it generated 36,400 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New Mexico, and its capacity factor sits at the 85th percentile of U.S. solar plants. By 2025 generation it ranks 4,489th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

27.5 MWNameplate capacity
29%Capacity factor, 2025, solar units, 85th percentile, on 15 MW net summer
0.1%Of NM generation, 2025
3 yearsAverage generator age, by MW

How hard does the Taos Mesa Energy Facility Hybrid plant run compared with other solar plants?

The Taos Mesa Energy Facility Hybrid plant's solar units had a capacity factor of 29% in 2025 on 15 MW of net summer capacity, the 85th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 104 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Taos Mesa Energy Facility Hybrid29%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Taos Mesa Energy Facility Hybrid plant generating more or less than last year?

Generation at Taos Mesa Energy Facility Hybrid fell 1.9% from 2024 to 2025, from 37,120 MWh to 36,400 MWh. Through August 2026 it is running 13.8% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202437,120
202536,400
2026 through August29,083
2025, same months25,560
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20263,846
July 20262,543
June 20264,288
May 20264,286
April 20263,990
March 20263,928
February 20263,772
January 20262,430
December 20252,070
November 20252,241
October 20253,167
September 20253,362
August 20253,863
July 20253,829
June 20253,749
May 20253,582
April 20253,253
March 20253,075
February 20252,364
January 20251,845
December 20242,289
November 20242,362
October 20243,131
September 20243,535
August 20243,608
July 20244,079
June 20243,690
May 20243,588
April 20243,912
March 20242,889
February 20242,116
January 20241,921

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Taos Mesa Energy Facility Hybrid plant?

Taos Mesa Energy Facility Hybrid made 0.1% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.2% of the state's 13,801 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 68th largest of 161 plants in New Mexico, the 4,477th largest of 14,327 in the U.S. and the 1,403rd largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 66th largest of 151 generating plants in the state.

Taos Mesa Energy Facility Hybrid within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)2813,8010.2%
Generation (MWh)36,40039,178,2460.1%
Solar capacity (MW)152,9020.5%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Taos Mesa Energy Facility Hybrid plant, and when do they retire?

2 operable generators total 27.5 MW, with an average age of 3 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s228100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BESSOperatingBatteries132022n/a
TMEF1OperatingSolar Photovoltaic152022n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Taos Mesa Energy Facility Hybrid plant?

EIA lists no joint owners for Taos Mesa Energy Facility Hybrid. Taos Mesa Energy Facility, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Taos Mesa Energy Facility Hybrid plant use?

Taos Mesa Energy Facility Hybrid has capacity on 2 fuels: 55% solar and 45% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar1554.5%37,559
Battery and pumped storage1345.5%-1,159

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Taos Mesa Energy Facility Hybrid plant?

Taos Mesa Energy Facility Hybrid is in El Prado, Taos County, New Mexico, at 36.4400° N, 105.6200° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Taos Mesa Energy Facility Hybrid's 15 MW is 1% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Caprock Solar 1 LLCQuay2556,965
Roadrunner SolarDona Ana2047,034
Hayhurst New Mexico SolarEddy2056,643
Taos Mesa Energy Facility HybridTaos1537,559
SunE EPE2 LLCDona Ana1226,429
Santolina Solar Energy CenterBernalillo1126,775
SPS4 MonumentLea1021,854

Source: EIA Forms EIA-860 and EIA-923, 2025.