Skip to main content
RateWatt

Solar power plant, New Mexico

Caprock Solar 1 LLC power plant, New Mexico

Caprock Solar 1 LLC is a 25 MW solar power plant in Quay County, New Mexico, operated by Deriva Energy, and it generated 56,965 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New Mexico, and its capacity factor sits at the 76th percentile of U.S. solar plants. By 2025 generation it ranks 3,926th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

25 MWNameplate capacity
27%Capacity factor, 2025, 76th percentile, on 24.4 MW net summer
0.1%Of NM generation, 2025
9 yearsAverage generator age, by MW

How hard does the Caprock Solar 1 LLC plant run compared with other solar plants?

The Caprock Solar 1 LLC plant had a capacity factor of 27% in 2025 on 24.4 MW of net summer capacity, the 76th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Caprock Solar 1 LLC27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Caprock Solar 1 LLC plant generating more or less than last year?

Generation at Caprock Solar 1 LLC fell 16.0% from 2024 to 2025, from 67,787 MWh to 56,965 MWh. Through August 2026 it is running 10.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202467,787
202556,965
2026 through August48,589
2025, same months43,924
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20267,245
July 20267,002
June 20266,864
May 20266,615
April 20266,746
March 20266,241
February 20264,201
January 20263,675
December 20253,478
November 20254,205
October 20252,474
September 20252,884
August 20256,462
July 20257,036
June 20253,497
May 20256,699
April 20256,359
March 20255,993
February 20254,201
January 20253,677
December 20243,688
November 20243,546
October 20245,420
September 20245,940
August 20246,281
July 20247,465
June 20246,847
May 20247,853
April 20247,460
March 20245,502
February 20244,344
January 20243,441

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Caprock Solar 1 LLC plant?

Caprock Solar 1 LLC made 0.1% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.2% of the state's 13,801 MW of capacity. By capacity it is the 71st largest of 161 plants in New Mexico, the 4,556th largest of 14,327 in the U.S. and the 1,048th largest of 7,223 solar plants. By 2025 generation it is the 62nd largest of 151 generating plants in the state.

Caprock Solar 1 LLC within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)2513,8010.2%
Generation (MWh)56,96539,178,2460.1%
Solar capacity (MW)252,9020.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Caprock Solar 1 LLC plant, and when do they retire?

1 operable generator totals 25 MW, with an average age of 9 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s125100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
PV1OperatingSolar Photovoltaic252016n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Caprock Solar 1 LLC plant?

Caprock Solar 1, LLC is the only joint owner reported for Caprock Solar 1 LLC, with 100.0%. Deriva Energy operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Caprock Solar 1 LLC plant?

Caprock Solar 1 LLC is in San Jon, Quay County, New Mexico, at 34.9828° N, 103.3783° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Caprock Solar 1 LLC's 25 MW is 1% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Cimarron Solar FacilityColfax3160,272
Chaves County Solar IIChaves3070,717
Alta LunaLuna2811,030
Caprock Solar 1 LLCQuay2556,965
Roadrunner SolarDona Ana2047,034
Hayhurst New Mexico SolarEddy2056,643
Taos Mesa Energy Facility HybridTaos1537,559