Skip to main content
RateWatt

Solar power plant, New Mexico

Hayhurst New Mexico Solar power plant, New Mexico

Hayhurst New Mexico Solar is a 20 MW solar power plant in Eddy County, New Mexico, operated by Hayhurst New Mexico Solar, and it generated 56,643 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New Mexico, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 3,933rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

20 MWNameplate capacity
32%Capacity factor, 2025, 97th percentile, on 20 MW net summer
0.1%Of NM generation, 2025
2 yearsAverage generator age, by MW

How hard does the Hayhurst New Mexico Solar plant run compared with other solar plants?

The Hayhurst New Mexico Solar plant had a capacity factor of 32% in 2025 on 20 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 118 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Hayhurst New Mexico Solar32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Hayhurst New Mexico Solar plant generating more or less than last year?

Generation at Hayhurst New Mexico Solar fell 10.8% from 2024 to 2025, from 63,522 MWh to 56,643 MWh.

Net generation by period
PeriodMWh
202463,522
202556,643
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20253,410
November 20253,355
October 20253,559
September 20254,314
August 20255,361
July 20255,055
June 20255,614
May 20256,604
April 20255,717
March 20255,648
February 20254,105
January 20253,901
December 20243,174
November 20244,607
October 20245,173
September 20245,274
August 20246,490
July 20246,473
June 20246,572
May 20247,192
April 20245,921
March 20244,957
February 20243,977
January 20243,712

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Hayhurst New Mexico Solar plant?

Hayhurst New Mexico Solar made 0.1% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.1% of the state's 13,801 MW of capacity. By capacity it is the 74th largest of 161 plants in New Mexico, the 4,775th largest of 14,327 in the U.S. and the 1,273rd largest of 7,223 solar plants. By 2025 generation it is the 63rd largest of 151 generating plants in the state.

Hayhurst New Mexico Solar within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)2013,8010.1%
Generation (MWh)56,64339,178,2460.1%
Solar capacity (MW)202,9020.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Hayhurst New Mexico Solar plant, and when do they retire?

1 operable generator totals 20 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s120100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
HHNMOperatingSolar Photovoltaic202023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Hayhurst New Mexico Solar plant?

2 owners report shares in Hayhurst New Mexico Solar; Algonquin Power Fund (America) Inc. holds the largest named share, 50.0% or about 10 MW. Hayhurst New Mexico Solar operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Algonquin Power Fund (America) Inc.50.0%1028,322
Chevron Renewable Investments, LLC50.0%1028,322

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Hayhurst New Mexico Solar plant?

Hayhurst New Mexico Solar is in Malaga, Eddy County, New Mexico, at 32.0707° N, 104.1616° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Hayhurst New Mexico Solar's 20 MW is 1% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Alta LunaLuna2811,030
Caprock Solar 1 LLCQuay2556,965
Roadrunner SolarDona Ana2047,034
Hayhurst New Mexico SolarEddy2056,643
Taos Mesa Energy Facility HybridTaos1537,559
SunE EPE2 LLCDona Ana1226,429
Santolina Solar Energy CenterBernalillo1126,775

Source: EIA Forms EIA-860 and EIA-923, 2025.