Skip to main content
RateWatt

Solar power plant, New Mexico

Britton Solar Energy Center, New Mexico

Britton Solar Energy Center is a 50 MW solar power plant in Torrance County, New Mexico, operated by Exus New Mexico, and it generated 140,936 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in New Mexico, and its capacity factor sits at the 97th percentile of U.S. solar plants. By 2025 generation it ranks 3,002nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
32%Capacity factor, 2025, 97th percentile, on 50 MW net summer
0.4%Of NM generation, 2025
6 yearsAverage generator age, by MW

How hard does the Britton Solar Energy Center plant run compared with other solar plants?

The Britton Solar Energy Center plant had a capacity factor of 32% in 2025 on 50 MW of net summer capacity, the 97th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 117 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Britton Solar Energy Center32%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Britton Solar Energy Center plant generating more or less than last year?

Generation at Britton Solar Energy Center fell 0.1% from 2024 to 2025, from 141,073 MWh to 140,936 MWh. Through August 2026 it is running 11.7% behind the same months of 2025.

Net generation by period
PeriodMWh
2024141,073
2025140,936
2026 through August90,382
2025, same months102,376
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,312
July 202614,263
June 202612,543
May 202610,680
April 20269,872
March 202610,733
February 202610,510
January 20268,469
December 20257,628
November 20258,954
October 202510,130
September 202511,848
August 202513,335
July 202513,882
June 202514,295
May 202514,629
April 202514,366
March 202513,434
February 202510,012
January 20258,423
December 20248,444
November 20248,472
October 202410,997
September 202412,676
August 202413,373
July 202414,859
June 202412,414
May 202416,084
April 202414,549
March 202411,471
February 202410,014
January 20247,720

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Britton Solar Energy Center plant?

Britton Solar Energy Center made 0.4% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.4% of the state's 13,801 MW of capacity. By capacity it is the 53rd largest of 161 plants in New Mexico, the 3,754th largest of 14,327 in the U.S. and the 891st largest of 7,223 solar plants. By 2025 generation it is the 45th largest of 151 generating plants in the state.

Britton Solar Energy Center within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)5013,8010.4%
Generation (MWh)140,93639,178,2460.4%
Solar capacity (MW)502,9021.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Britton Solar Energy Center plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 6 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
BSECOperatingSolar Photovoltaic502019n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Britton Solar Energy Center plant?

EIA lists no joint owners for Britton Solar Energy Center. Exus New Mexico operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Britton Solar Energy Center plant?

Britton Solar Energy Center is in Moriarty, Torrance County, New Mexico, at 35.0160° N, 106.0980° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Britton Solar Energy Center's 50 MW is 2% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Roswell Solar, LLCChaves70153,135
Macho SpringsLuna55124,218
Encino Solar Energy CenterSandoval55142,990
Britton Solar Energy CenterTorrance50140,936
Jicarilla Solar 2Rio Arriba50127,578
Jicarilla Solar 1 LLCRio Arriba50111,188
NMRD Data Center III, LLCSandoval50135,624

Source: EIA Forms EIA-860 and EIA-923, 2025.