Skip to main content
RateWatt

Solar power plant, New Mexico

Jicarilla Solar 1 LLC power plant, New Mexico

Jicarilla Solar 1 LLC is a 70 MW power plant, 50 MW of it solar, in Rio Arriba County, New Mexico, operated by Repsol Renewables NA, and it generated 106,985 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in New Mexico, and its capacity factor sits at the 67th percentile of U.S. solar plants. By 2025 generation it ranks 3,318th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

70 MWNameplate capacity
25%Capacity factor, 2025, solar units, 67th percentile, on 50 MW net summer
0.3%Of NM generation, 2025
2 yearsAverage generator age, by MW

How hard does the Jicarilla Solar 1 LLC plant run compared with other solar plants?

The Jicarilla Solar 1 LLC plant's solar units had a capacity factor of 25% in 2025 on 50 MW of net summer capacity, the 67th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 93 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Jicarilla Solar 1 LLC25%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Jicarilla Solar 1 LLC plant generating more or less than last year?

Generation at Jicarilla Solar 1 LLC rose 29.2% from 2024 to 2025, from 82,837 MWh to 106,985 MWh. Through August 2026 it is running 15.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
202482,837
2025106,985
2026 through August85,589
2025, same months74,055
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,628
July 202613,373
June 202610,627
May 202611,647
April 20269,394
March 202612,234
February 20268,126
January 20267,560
December 20256,956
November 20256,655
October 20259,304
September 202510,015
August 202512,337
July 202511,643
June 202511,807
May 202510,274
April 20259,985
March 20257,841
February 20254,203
January 20255,965
December 20246,941
November 20246,825
October 20249,377
September 202411,631
August 202410,012
July 20247,871
June 20243,004
May 20242,942
April 20244,842
March 20246,882
February 20246,575
January 20245,935

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Jicarilla Solar 1 LLC plant?

Jicarilla Solar 1 LLC made 0.3% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.5% of the state's 13,801 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 45th largest of 161 plants in New Mexico, the 3,346th largest of 14,327 in the U.S. and the 906th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 53rd largest of 151 generating plants in the state.

Jicarilla Solar 1 LLC within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)7013,8010.5%
Generation (MWh)106,98539,178,2460.3%
Solar capacity (MW)502,9021.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Jicarilla Solar 1 LLC plant, and when do they retire?

2 operable generators total 70 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s270100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
JICB1OperatingBatteries202023n/a
JICS1OperatingSolar Photovoltaic502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Jicarilla Solar 1 LLC plant?

EIA lists no joint owners for Jicarilla Solar 1 LLC. Repsol Renewables NA operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Jicarilla Solar 1 LLC plant use?

Jicarilla Solar 1 LLC has capacity on 2 fuels: 71% solar and 29% battery and pumped storage. In 2025, solar made 104% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar5071.4%111,188
Battery and pumped storage2028.6%-4,203

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Jicarilla Solar 1 LLC plant?

Jicarilla Solar 1 LLC is in Dulce, Rio Arriba County, New Mexico, at 36.3167° N, 107.2776° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Jicarilla Solar 1 LLC's 50 MW is 2% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Encino Solar Energy CenterSandoval55142,990
Britton Solar Energy CenterTorrance50140,936
Jicarilla Solar 2Rio Arriba50127,578
Jicarilla Solar 1 LLCRio Arriba50111,188
NMRD Data Center III, LLCSandoval50135,624
Route 66 Energy Center, LLCCibola50131,985
Cimarron Solar FacilityColfax3160,272

Source: EIA Forms EIA-860 and EIA-923, 2025.