Solar power plant, New Mexico

Jicarilla Solar 2 power plant, New Mexico

Jicarilla Solar 2 is a 50 MW solar power plant in Rio Arriba County, New Mexico, operated by Repsol Renewables NA, and it generated 127,578 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in New Mexico, and its capacity factor sits at the 88th percentile of U.S. solar plants. By 2025 generation it ranks 3,125th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

50 MWNameplate capacity
29%Capacity factor, 2025, 88th percentile, on 50 MW net summer
0.3%Of NM generation, 2025
2 yearsAverage generator age, by MW

How hard does the Jicarilla Solar 2 plant run compared with other solar plants?

The Jicarilla Solar 2 plant had a capacity factor of 29% in 2025 on 50 MW of net summer capacity, the 88th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 106 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Jicarilla Solar 229%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Jicarilla Solar 2 plant generating more or less than last year?

Generation at Jicarilla Solar 2 rose 7.6% from 2024 to 2025, from 118,557 MWh to 127,578 MWh. Through August 2026 it is running 2.1% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024118,557
2025127,578
2026 through August94,683
2025, same months92,731
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202612,991
July 202613,672
June 202611,465
May 202612,966
April 202613,282
March 202613,430
February 20268,979
January 20267,898
December 20257,101
November 20257,255
October 202510,060
September 202510,431
August 202513,541
July 202513,660
June 202513,887
May 202512,877
April 202512,096
March 202511,027
February 20258,705
January 20256,938
December 20245,160
November 20246,275
October 202410,222
September 202411,808
August 202410,331
July 202413,218
June 202412,446
May 202413,877
April 202410,981
March 20249,827
February 20247,417
January 20246,995

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Jicarilla Solar 2 plant?

Jicarilla Solar 2 made 0.3% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.4% of the state's 13,801 MW of capacity. By capacity it is the 53rd largest of 161 plants in New Mexico, the 3,754th largest of 14,327 in the U.S. and the 901st largest of 7,223 solar plants. By 2025 generation it is the 49th largest of 151 generating plants in the state.

Jicarilla Solar 2 within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)5013,8010.4%
Generation (MWh)127,57839,178,2460.3%
Solar capacity (MW)502,9021.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Jicarilla Solar 2 plant, and when do they retire?

1 operable generator totals 50 MW, with an average age of 2 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s150100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
JICS2OperatingSolar Photovoltaic502023n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Jicarilla Solar 2 plant?

EIA lists no joint owners for Jicarilla Solar 2. Repsol Renewables NA operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Jicarilla Solar 2 plant?

Jicarilla Solar 2 is in Dulce, Rio Arriba County, New Mexico, at 36.1411° N, 107.1712° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Jicarilla Solar 2's 50 MW is 2% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Macho SpringsLuna55124,218
Encino Solar Energy CenterSandoval55142,990
Britton Solar Energy CenterTorrance50140,936
Jicarilla Solar 2Rio Arriba50127,578
Jicarilla Solar 1 LLCRio Arriba50111,188
NMRD Data Center III, LLCSandoval50135,624
Route 66 Energy Center, LLCCibola50131,985

Source: EIA Forms EIA-860 and EIA-923, 2025.