Solar power plant, New Mexico

Encino Solar Energy Center, New Mexico

Encino Solar Energy Center is a 55 MW solar power plant in Sandoval County, New Mexico, operated by Exus New Mexico, and it generated 142,990 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.4% of the generation reported in New Mexico, and its capacity factor sits at the 89th percentile of U.S. solar plants. By 2025 generation it ranks 2,977th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

55 MWNameplate capacity
30%Capacity factor, 2025, 89th percentile, on 55 MW net summer
0.4%Of NM generation, 2025
5 yearsAverage generator age, by MW

How hard does the Encino Solar Energy Center plant run compared with other solar plants?

The Encino Solar Energy Center plant had a capacity factor of 30% in 2025 on 55 MW of net summer capacity, the 89th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 108 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Encino Solar Energy Center30%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Encino Solar Energy Center plant generating more or less than last year?

Generation at Encino Solar Energy Center rose 0.4% from 2024 to 2025, from 142,427 MWh to 142,990 MWh. Through August 2026 it is running 12.0% behind the same months of 2025.

Net generation by period
PeriodMWh
2024142,427
2025142,990
2026 through August91,645
2025, same months104,092
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202613,967
July 202615,112
June 202613,646
May 202610,498
April 20269,668
March 202610,465
February 20269,931
January 20268,358
December 20257,630
November 20258,643
October 202510,721
September 202511,904
August 202513,844
July 202514,915
June 202514,801
May 202514,760
April 202514,295
March 202512,710
February 202510,027
January 20258,740
December 20248,187
November 20248,567
October 202411,713
September 202413,236
August 202413,089
July 202414,531
June 202413,474
May 202415,773
April 202414,772
March 202411,714
February 20249,926
January 20247,445

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Encino Solar Energy Center plant?

Encino Solar Energy Center made 0.4% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.4% of the state's 13,801 MW of capacity. By capacity it is the 48th largest of 161 plants in New Mexico, the 3,634th largest of 14,327 in the U.S. and the 837th largest of 7,223 solar plants. By 2025 generation it is the 44th largest of 151 generating plants in the state.

Encino Solar Energy Center within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)5513,8010.4%
Generation (MWh)142,99039,178,2460.4%
Solar capacity (MW)552,9021.9%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Encino Solar Energy Center plant, and when do they retire?

1 operable generator totals 55 MW, with an average age of 5 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s155100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ESECOperatingSolar Photovoltaic552020n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Encino Solar Energy Center plant?

EIA lists no joint owners for Encino Solar Energy Center. Exus New Mexico operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Encino Solar Energy Center plant?

Encino Solar Energy Center is in Rio Rancho Estates, Sandoval County, New Mexico, at 35.3540° N, 106.8580° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Encino Solar Energy Center's 55 MW is 2% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Chaves Solar, LLCChaves70154,745
Roswell Solar, LLCChaves70153,135
Macho SpringsLuna55124,218
Encino Solar Energy CenterSandoval55142,990
Britton Solar Energy CenterTorrance50140,936
Jicarilla Solar 2Rio Arriba50127,578
Jicarilla Solar 1 LLCRio Arriba50111,188

Source: EIA Forms EIA-860 and EIA-923, 2025.