Skip to main content
RateWatt

Hydro power plant, New Mexico

Navajo Dam, New Mexico

Navajo Dam is a 30 MW hydro power plant in San Juan County, New Mexico, operated by City of Farmington-(NM), and it generated 88,327 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in New Mexico, and its capacity factor sits at the 51st percentile of U.S. hydro plants. By 2025 generation it ranks 3,535th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
34%Capacity factor, 2025, 51st percentile, on 30 MW net summer
0.2%Of NM generation, 2025
36 yearsAverage generator age, by MW

How hard does the Navajo Dam plant run compared with other hydro plants?

The Navajo Dam plant had a capacity factor of 34% in 2025 on 30 MW of net summer capacity, the 51st percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 123 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Navajo Dam34%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Navajo Dam plant generating more or less than last year?

Navajo Dam generated 88,327 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 11 months, so the two years are not compared.

Net generation by period
PeriodMWh
202471,962
202588,327
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20254,293
November 20257,057
October 20255,441
September 20259,428
August 202515,148
July 202512,653
June 20255,872
May 20255,351
April 20255,636
March 20256,210
February 20255,530
January 20255,708
December 20241,447
November 20240
October 2024105
September 202410,950
August 202413,921
July 202410,013
June 20245,484
May 20246,131
April 20246,653
March 20246,006
February 20245,748
January 20245,504

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Navajo Dam plant?

Navajo Dam made 0.2% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.2% of the state's 13,801 MW of capacity. By capacity it is the 63rd largest of 161 plants in New Mexico, the 4,354th largest of 14,327 in the U.S. and the 364th largest of 1,393 hydro plants. By 2025 generation it is the 55th largest of 151 generating plants in the state.

Navajo Dam within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)3013,8010.2%
Generation (MWh)88,32739,178,2460.2%
Hydro capacity (MW)308236.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Navajo Dam plant, and when do they retire?

2 operable generators total 30 MW, with an average age of 36 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s230100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric151989n/a
2OperatingConventional Hydroelectric151989n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Navajo Dam plant?

EIA lists no joint owners for Navajo Dam. City of Farmington-(NM) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Farmington charge homes?

City of Farmington, the operator of Navajo Dam, had an average residential price of 12.96¢ per kWh and an average bill of $84 a month in 2025, 13% below the New Mexico average of 14.85¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst New Mexico
City of Farmington12.96¢$8413% lower
New Mexico average14.85¢$95
U.S. average17.23¢$15116% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Navajo Dam plant?

Navajo Dam is in Farmington, San Juan County, New Mexico, at 36.8061° N, 107.6131° W. It sits in the Western Area Power Administration - Rocky Mountain Region balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in New Mexico are similar in size?

New Mexico has 4 operable hydro plants with 81.5 MW of capacity, and Navajo Dam's 30 MW is 37% of that.

Hydro plants in New Mexico around this size
PlantCountyMW2025 MWh
Navajo DamSan Juan3088,327
Elephant ButteSierra2816,624
Abiquiu DamRio Arriba1615,737

Source: EIA Forms EIA-860 and EIA-923, 2025.