Skip to main content
RateWatt

Solar power plant, New Mexico

Arroyo Solar Energy Storage Hybrid power plant, New Mexico

Arroyo Solar Energy Storage Hybrid is a 450 MW power plant, 300 MW of it solar, in McKinley County, New Mexico, operated by Arroyo Solar LLC, and it generated 678,974 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.7% of the generation reported in New Mexico, and its capacity factor sits at the 75th percentile of U.S. solar plants. By 2025 generation it ranks 1,017th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

450 MWNameplate capacity
27%Capacity factor, 2025, solar units, 75th percentile, on 300 MW net summer
1.7%Of NM generation, 2025
1 yearAverage generator age, by MW

How hard does the Arroyo Solar Energy Storage Hybrid plant run compared with other solar plants?

The Arroyo Solar Energy Storage Hybrid plant's solar units had a capacity factor of 27% in 2025 on 300 MW of net summer capacity, the 75th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 97 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Arroyo Solar Energy Storage Hybrid27%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Arroyo Solar Energy Storage Hybrid plant generating more or less than last year?

Generation at Arroyo Solar Energy Storage Hybrid fell 3.0% from 2024 to 2025, from 700,303 MWh to 678,974 MWh. Through August 2026 it is running 11.4% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024700,303
2025678,974
2026 through August550,782
2025, same months494,301
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202666,745
July 202681,958
June 202688,753
May 202687,283
April 202677,181
March 202666,827
February 202639,144
January 202642,891
December 202538,237
November 202541,641
October 202544,832
September 202559,963
August 202569,949
July 202571,635
June 202576,017
May 202573,482
April 202560,747
March 202549,516
February 202546,932
January 202546,023
December 202441,333
November 202440,462
October 202451,397
September 202465,635
August 202465,621
July 202484,800
June 202465,682
May 202470,704
April 202472,065
March 202457,846
February 202447,685
January 202437,073

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Arroyo Solar Energy Storage Hybrid plant?

Arroyo Solar Energy Storage Hybrid made 1.7% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 3.3% of the state's 13,801 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 5th largest of 161 plants in New Mexico, the 793rd largest of 14,327 in the U.S. and the 44th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 15th largest of 151 generating plants in the state.

Arroyo Solar Energy Storage Hybrid within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)45013,8013.3%
Generation (MWh)678,97439,178,2461.7%
Solar capacity (MW)3002,90210.3%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Arroyo Solar Energy Storage Hybrid plant, and when do they retire?

2 operable generators total 450 MW, with an average age of 1 year weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2450100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
ARESSOperatingBatteries1502023n/a
ARSOLOperatingSolar Photovoltaic3002024n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Arroyo Solar Energy Storage Hybrid plant?

EIA lists no joint owners for Arroyo Solar Energy Storage Hybrid. Arroyo Solar LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Arroyo Solar Energy Storage Hybrid plant use?

Arroyo Solar Energy Storage Hybrid has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 103% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar30066.7%697,111
Battery and pumped storage15033.3%-18,137

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Arroyo Solar Energy Storage Hybrid plant?

Arroyo Solar Energy Storage Hybrid is in Pueblo Pintado, McKinley County, New Mexico, at 35.9703° N, 107.5631° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Arroyo Solar Energy Storage Hybrid's 300 MW is 10% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
Arroyo Solar Energy Storage HybridMcKinley300697,111
Atrisco Solar LLCBernalillo300717,749
San Juan Solar ISan Juan200503,209
Escalante (NM)McKinley200526,335

Source: EIA Forms EIA-860 and EIA-923, 2025.