Milagro Solar I is a 225 MW power plant, 150 MW of it solar, in Dona Ana County, New Mexico, operated by Milagro Solar I, LLC, and it generated 279,072 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in New Mexico, and its capacity factor sits at the 34th percentile of U.S. solar plants. By 2025 generation it ranks 2,065th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

225 MWNameplate capacity
21%Capacity factor, 2025, solar units, 34th percentile, on 150 MW net summer
0.7%Of NM generation, 2025
Under 1 yearAverage generator age, by MW

How hard does the Milagro Solar I plant run compared with other solar plants?

The Milagro Solar I plant's solar units had a capacity factor of 21% in 2025 on 150 MW of net summer capacity, the 34th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 78 days at full output out of 365.

0%Shaded: the middle half of solar plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Milagro Solar I21%
Solar plants, 75th percentile27%
Solar plants, median23%
Solar plants, 25th percentile20%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does, for its solar generators only. Values above 105% are left out of the comparison.

Is the Milagro Solar I plant generating more or less than last year?

Milagro Solar I generated 279,072 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 120.6% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024n/a
2025279,072
2026 through August333,000
2025, same months150,929
Monthly generation, May 2025 to Aug 2026
MonthMWh
August 202647,136
July 202646,498
June 202644,908
May 202648,240
April 202640,465
March 202644,749
February 202632,674
January 202628,330
December 202528,307
November 202530,658
October 202536,557
September 202532,621
August 202540,996
July 202542,091
June 202545,197
May 202522,645

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Milagro Solar I plant?

Milagro Solar I made 0.7% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 1.6% of the state's 13,801 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 21st largest of 161 plants in New Mexico, the 1,383rd largest of 14,327 in the U.S. and the 296th largest of 7,223 solar plants on its solar units alone. By 2025 generation it is the 32nd largest of 151 generating plants in the state.

Milagro Solar I within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)22513,8011.6%
Generation (MWh)279,07239,178,2460.7%
Solar capacity (MW)1502,9025.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Milagro Solar I plant, and when do they retire?

2 operable generators total 225 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2225100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
MLRBSOperatingBatteries752025n/a
MLRPVOperatingSolar Photovoltaic1502025n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Milagro Solar I plant?

EIA lists no joint owners for Milagro Solar I. Milagro Solar I, LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What fuels does the Milagro Solar I plant use?

Milagro Solar I has capacity on 2 fuels: 67% solar and 33% battery and pumped storage. In 2025, solar made 100% of its output.

Capacity and 2025 generation by fuel
FuelMWShare2025 MWh
Solar15066.7%279,072
Battery and pumped storage7533.3%0

Source: EIA Forms EIA-860 and EIA-923, 2025.

Where is the Milagro Solar I plant?

Milagro Solar I is in Santa Teresa, Dona Ana County, New Mexico, at 31.7960° N, 106.6420° W. It sits in the El Paso Electric Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which solar plants in New Mexico are similar in size?

New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Milagro Solar I's 150 MW is 5% of that.

Solar plants in New Mexico around this size
PlantCountyMW2025 MWh
San Juan Solar ISan Juan200503,209
Escalante (NM)McKinley200526,335
Sky Ranch SolarValencia190510,831
Milagro Solar IDona Ana150279,072
TAGSandoval14096,214
Shallow BasketRio Arriba140140,104
Buena Vista Energy CenterOtero120391,039

Source: EIA Forms EIA-860 and EIA-923, 2025.