Sterling I Wind Farm, New Mexico

Sterling I Wind Farm is a 29.9 MW wind power plant in Lea County, New Mexico, operated by AEM Wind LLC, and it generated 111,108 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.3% of the generation reported in New Mexico, and its capacity factor sits at the 84th percentile of U.S. wind plants. By 2025 generation it ranks 3,283rd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

29.9 MWNameplate capacity
42%Capacity factor, 2025, 84th percentile, on 29.9 MW net summer
0.3%Of NM generation, 2025
8 yearsAverage generator age, by MW

How hard does the Sterling I Wind Farm plant run compared with other wind plants?

The Sterling I Wind Farm plant had a capacity factor of 42% in 2025 on 29.9 MW of net summer capacity, the 84th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 155 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Sterling I Wind Farm42%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Sterling I Wind Farm plant generating more or less than last year?

Generation at Sterling I Wind Farm fell 5.5% from 2024 to 2025, from 117,535 MWh to 111,108 MWh. Through August 2026 it is running 7.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024117,535
2025111,108
2026 through August76,474
2025, same months71,456
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 20269,779
July 20267,998
June 20268,916
May 20268,432
April 202611,197
March 202610,422
February 202610,334
January 20269,396
December 202510,384
November 202510,760
October 202511,235
September 20257,273
August 20257,874
July 20256,232
June 20258,377
May 20259,445
April 202510,680
March 202511,105
February 20258,600
January 20259,143
December 20249,837
November 20249,723
October 202410,276
September 20247,926
August 20246,841
July 20246,879
June 20248,730
May 202411,546
April 202412,272
March 202412,019
February 202412,146
January 20249,340

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Sterling I Wind Farm plant?

Sterling I Wind Farm made 0.3% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 0.2% of the state's 13,801 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 65th largest of 161 plants in New Mexico, the 4,414th largest of 14,327 in the U.S. and the 962nd largest of 1,358 wind plants. By 2025 generation it is the 52nd largest of 151 generating plants in the state.

Sterling I Wind Farm within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)3013,8010.2%
Generation (MWh)111,10839,178,2460.3%
Wind capacity (MW)304,4290.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Sterling I Wind Farm plant, and when do they retire?

1 operable generator totals 29.9 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s130100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
STER1OperatingOnshore Wind Turbine302017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Sterling I Wind Farm plant?

EIA lists no joint owners for Sterling I Wind Farm. AEM Wind LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Sterling I Wind Farm plant?

Sterling I Wind Farm is in Tatum, Lea County, New Mexico, at 33.3596° N, 103.2506° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in New Mexico are similar in size?

New Mexico has 29 operable wind plants with 4,429 MW of capacity, and Sterling I Wind Farm's 29.9 MW is 1% of that.

Wind plants in New Mexico around this size
PlantCountyMW2025 MWh
Casa Mesa Wind Energy Center HybridQuay51180,107
Macho Springs Power ILuna50115,304
Milo Wind Project LLCRoosevelt50183,452
Sterling I Wind FarmLea30111,108
Wildcat WindLea2755,110

Source: EIA Forms EIA-860 and EIA-923, 2025.