Skip to main content
RateWatt

Wind power plant, New Mexico

El Cabo Wind power plant, New Mexico

El Cabo Wind is a 298 MW wind power plant in Torrance County, New Mexico, operated by Avangrid Power LLC, and it generated 1,058,198 MWh in 2025 (Forms EIA-860 and EIA-923). That is 2.7% of the generation reported in New Mexico, and its capacity factor sits at the 75th percentile of U.S. wind plants. By 2025 generation it ranks 710th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

298 MWNameplate capacity
41%Capacity factor, 2025, 75th percentile, on 298 MW net summer
2.7%Of NM generation, 2025
8 yearsAverage generator age, by MW

How hard does the El Cabo Wind plant run compared with other wind plants?

The El Cabo Wind plant had a capacity factor of 41% in 2025 on 298 MW of net summer capacity, the 75th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 148 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
El Cabo Wind41%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the El Cabo Wind plant generating more or less than last year?

Generation at El Cabo Wind fell 5.5% from 2024 to 2025, from 1,119,501 MWh to 1,058,198 MWh. Through August 2026 it is running 6.5% ahead of the same months of 2025.

Net generation by period
PeriodMWh
20241,119,501
20251,058,198
2026 through August746,826
2025, same months701,548
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202659,313
July 202656,502
June 202693,807
May 202697,407
April 2026117,199
March 2026112,253
February 2026105,270
January 2026105,075
December 2025137,868
November 202583,385
October 202586,471
September 202548,926
August 202552,722
July 202556,384
June 202565,776
May 202583,391
April 202568,389
March 2025141,621
February 2025121,382
January 2025111,883
December 2024117,584
November 2024119,601
October 202491,588
September 202451,788
August 202445,384
July 202456,657
June 202478,543
May 2024114,993
April 2024106,859
March 2024126,782
February 2024109,389
January 2024100,333

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the El Cabo Wind plant?

El Cabo Wind made 2.7% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 2.2% of the state's 13,801 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 14th largest of 161 plants in New Mexico, the 1,098th largest of 14,327 in the U.S. and the 98th largest of 1,358 wind plants. By 2025 generation it is the 8th largest of 151 generating plants in the state.

El Cabo Wind within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)29813,8012.2%
Generation (MWh)1,058,19839,178,2462.7%
Wind capacity (MW)2984,4296.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the El Cabo Wind plant, and when do they retire?

1 operable generator totals 298 MW, with an average age of 8 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1298100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2982017n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the El Cabo Wind plant?

EIA lists no joint owners for El Cabo Wind. Avangrid Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the El Cabo Wind plant?

El Cabo Wind is in Encino, Torrance County, New Mexico, at 34.6511° N, 105.4617° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in New Mexico are similar in size?

New Mexico has 29 operable wind plants with 4,429 MW of capacity, and El Cabo Wind's 298 MW is 7% of that.

Wind plants in New Mexico around this size
PlantCountyMW2025 MWh
Red Cloud Wind LLCLincoln3501,179,142
Clines Corners Wind Farm LLCTorrance3251,061,779
La Joya NMTorrance306905,759
El Cabo WindTorrance2981,058,198
Tecolote Wind LLCLincoln272868,802
Roosevelt CountyRoosevelt250983,873
Oso Grande Wind FarmLea250550,765