Skip to main content
RateWatt

Wind power plant, New Mexico

Oso Grande Wind Farm, New Mexico

Oso Grande Wind Farm is a 250 MW wind power plant in Lea County, New Mexico, operated by Tucson Electric Power Co, and it generated 550,765 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in New Mexico, and its capacity factor sits at the 23rd percentile of U.S. wind plants. By 2025 generation it ranks 1,242nd of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

250 MWNameplate capacity
25%Capacity factor, 2025, 23rd percentile, on 250 MW net summer
1.4%Of NM generation, 2025
4 yearsAverage generator age, by MW

How hard does the Oso Grande Wind Farm plant run compared with other wind plants?

The Oso Grande Wind Farm plant had a capacity factor of 25% in 2025 on 250 MW of net summer capacity, the 23rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 92 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Oso Grande Wind Farm25%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Oso Grande Wind Farm plant generating more or less than last year?

Generation at Oso Grande Wind Farm fell 22.4% from 2024 to 2025, from 709,607 MWh to 550,765 MWh. Through August 2026 it is running 11.0% ahead of the same months of 2025.

Net generation by period
PeriodMWh
2024709,607
2025550,765
2026 through August423,533
2025, same months381,553
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202645,499
July 202646,828
June 202650,383
May 202659,669
April 202665,745
March 202653,093
February 202655,347
January 202646,969
December 202541,581
November 202531,213
October 202550,248
September 202546,170
August 202542,407
July 202527,926
June 202546,396
May 202554,184
April 202565,655
March 202570,419
February 202527,804
January 202546,762
December 202457,678
November 202470,948
October 202472,165
September 202457,344
August 202453,350
July 202440,981
June 202462,397
May 202458,268
April 202462,495
March 202463,959
February 202458,415
January 202451,607

Source: EIA Form EIA-923, through August 2026.

How much of New Mexico's electricity comes from the Oso Grande Wind Farm plant?

Oso Grande Wind Farm made 1.4% of the 39,178,246 MWh reported by New Mexico plants in 2025, from 1.8% of the state's 13,801 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 18th largest of 161 plants in New Mexico, the 1,279th largest of 14,327 in the U.S. and the 150th largest of 1,358 wind plants. By 2025 generation it is the 19th largest of 151 generating plants in the state.

Oso Grande Wind Farm within New Mexico, 2025
MeasureThis plantNew MexicoShare
Capacity (MW)25013,8011.8%
Generation (MWh)550,76539,178,2461.4%
Wind capacity (MW)2504,4295.6%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Oso Grande Wind Farm plant, and when do they retire?

2 operable generators total 250 MW, with an average age of 4 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2020s2250100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
OGW24OperatingOnshore Wind Turbine342021n/a
OGW45OperatingOnshore Wind Turbine2162021n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Oso Grande Wind Farm plant?

EIA lists no joint owners for Oso Grande Wind Farm. Tucson Electric Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Tucson Electric Power Co charge homes?

Tucson Electric Power Co, the operator of Oso Grande Wind Farm, had an average residential price of 14.88¢ per kWh and an average bill of $117 a month in 2025 in Arizona.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst New Mexico
Tucson Electric Power Co14.88¢$117other state
New Mexico average14.85¢$95
U.S. average17.23¢$15116% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Oso Grande Wind Farm plant?

Oso Grande Wind Farm is in Maljamar, Lea County, New Mexico, at 32.9323° N, 103.6664° W. It sits in the Tucson Electric Power Company balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in New Mexico are similar in size?

New Mexico has 29 operable wind plants with 4,429 MW of capacity, and Oso Grande Wind Farm's 250 MW is 6% of that.

Wind plants in New Mexico around this size
PlantCountyMW2025 MWh
El Cabo WindTorrance2981,058,198
Tecolote Wind LLCLincoln272868,802
Roosevelt CountyRoosevelt250983,873
Oso Grande Wind FarmLea250550,765
Aragonne Wind LLCGuadalupe235614,629
Grady Wind Energy Center, LLCCurry221804,812
New Mexico Wind Energy CenterQuay204502,918

Source: EIA Forms EIA-860 and EIA-923, 2025.