Wind power plant, New Mexico
Caprock Wind Farm, New Mexico
Caprock Wind Farm is a 100 MW wind power plant in Quay County, New Mexico, operated by Leeward Asset Management, LLC, and it generated 378,712 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in New Mexico, and its capacity factor sits at the 86th percentile of U.S. wind plants. By 2025 generation it ranks 1,659th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Caprock Wind Farm plant run compared with other wind plants?
The Caprock Wind Farm plant had a capacity factor of 43% in 2025 on 100 MW of net summer capacity, the 86th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 158 days at full output out of 365.
0%Shaded: the middle half of wind plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Caprock Wind Farm | 43% |
| Wind plants, 75th percentile | 41% |
| Wind plants, median | 33% |
| Wind plants, 25th percentile | 26% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Caprock Wind Farm plant generating more or less than last year?
Caprock Wind Farm generated 378,712 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 9 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 209,923 |
| 2025 | 378,712 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 33,874 |
| November 2025 | 32,613 |
| October 2025 | 34,653 |
| September 2025 | 28,215 |
| August 2025 | 27,339 |
| July 2025 | 26,939 |
| June 2025 | 30,765 |
| May 2025 | 29,077 |
| April 2025 | 38,173 |
| March 2025 | 37,713 |
| February 2025 | 28,528 |
| January 2025 | 30,823 |
| December 2024 | 0 |
| November 2024 | 0 |
| October 2024 | 0 |
| September 2024 | 12,869 |
| August 2024 | 19,272 |
| July 2024 | 22,538 |
| June 2024 | 27,550 |
| May 2024 | 22,278 |
| April 2024 | 26,728 |
| March 2024 | 27,610 |
| February 2024 | 26,626 |
| January 2024 | 24,452 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Caprock Wind Farm plant, and when do they retire?
2 operable generators total 100 MW, with an average age of 21 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2000s | 2 | 100 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Onshore Wind Turbine | 80 | 2004 | n/a |
| 2 | Operating | Onshore Wind Turbine | 20 | 2005 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Caprock Wind Farm plant?
EIA lists no joint owners for Caprock Wind Farm. Leeward Asset Management, LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Caprock Wind Farm plant?
Caprock Wind Farm is in San Jon, Quay County, New Mexico, at 34.9806° N, 103.3539° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).
Source: EIA Form EIA-860, Plant, 2025 final.
Which wind plants in New Mexico are similar in size?
New Mexico has 29 operable wind plants with 4,429 MW of capacity, and Caprock Wind Farm's 100 MW is 2% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| San Juan Mesa Wind Project LLC | Roosevelt | 120 | 250,501 |
| Duran Mesa LLC | Lincoln | 105 | 362,167 |
| Red Mesa Wind LLC | Sandoval | 102 | 163,235 |
| Caprock Wind Farm | Quay | 100 | 378,712 |
| High Lonesome Mesa LLC | Torrance | 100 | 313,427 |
| Borderlands Wind, LLC | Catron | 100 | 252,062 |
| Casa Mesa Wind Energy Center Hybrid | Quay | 51 | 180,107 |
Source: EIA Forms EIA-860 and EIA-923, 2025.