Solar power plant, New Mexico
Quail Ranch Solar and BESS power plant, New Mexico
Quail Ranch Solar and BESS is a 100 MW solar power plant in Bernalillo County, New Mexico, operated by Quail Ranch Solar and Battery Energy Storage System, and it generated 31,455 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in New Mexico, and its capacity factor sits at the 4th percentile of U.S. solar plants. By 2025 generation it ranks 4,684th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Quail Ranch Solar and BESS plant run compared with other solar plants?
The Quail Ranch Solar and BESS plant had a capacity factor of 4% in 2025 on 100 MW of net summer capacity, the 4th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 13 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Quail Ranch Solar and BESS | 4% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Quail Ranch Solar and BESS plant generating more or less than last year?
Quail Ranch Solar and BESS generated 31,455 MWh in 2025; EIA reports no 2024 total to compare.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 31,455 |
| 2026 through August | 186,926 |
Monthly generation, Dec 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 27,946 |
| July 2026 | 23,137 |
| June 2026 | 28,337 |
| May 2026 | 27,055 |
| April 2026 | 24,399 |
| March 2026 | 21,681 |
| February 2026 | 18,307 |
| January 2026 | 16,064 |
| December 2025 | 31,455 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Quail Ranch Solar and BESS plant, and when do they retire?
1 operable generator totals 100 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 100 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 100 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| QRPV | Operating | Solar Photovoltaic | 100 | 2025 | n/a |
| QRBES | Under construction, over half built | Batteries | 100 | 2026 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Quail Ranch Solar and BESS plant?
Clenera LLC is the only joint owner reported for Quail Ranch Solar and BESS, with 100.0%. Quail Ranch Solar and Battery Energy Storage System operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Quail Ranch Solar and BESS plant?
Quail Ranch Solar and BESS is in Rio Rancho, Bernalillo County, New Mexico, at 35.1991° N, 106.8566° W. It sits in the Public Service Company of New Mexico balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in New Mexico are similar in size?
New Mexico has 101 operable solar plants with 2,902 MW of capacity, and Quail Ranch Solar and BESS' 100 MW is 3% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| TAG | Sandoval | 140 | 96,214 |
| Shallow Basket | Rio Arriba | 140 | 140,104 |
| Buena Vista Energy Center | Otero | 120 | 391,039 |
| Quail Ranch Solar and BESS | Bernalillo | 100 | 31,455 |
| Chaves Solar, LLC | Chaves | 70 | 154,745 |
| Roswell Solar, LLC | Chaves | 70 | 153,135 |
| Macho Springs | Luna | 55 | 124,218 |
Source: EIA Forms EIA-860 and EIA-923, 2025.