Liberty Hybrid Solar and Storage Project is a 67.2 MW solar power plant in Harris County, Texas, operated by Liberty 1 Solar LLC, and it generated 53,440 MWh in 2025 (Forms EIA-860 and EIA-923). Its capacity factor sits at the 7th percentile of U.S. solar plants. By 2025 generation it ranks 4,014th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Liberty Hybrid Solar and Storage Project plant run compared with other solar plants?
The Liberty Hybrid Solar and Storage Project plant had a capacity factor of 9% in 2025 on 67.2 MW of net summer capacity, the 7th percentile of the 1,298 U.S. solar plants with at least 20 MW. The typical solar plant reached 23%. That equals about 33 days at full output out of 365.
0%Shaded: the middle half of solar plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Liberty Hybrid Solar and Storage Project | 9% |
| Solar plants, 75th percentile | 27% |
| Solar plants, median | 23% |
| Solar plants, 25th percentile | 20% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Liberty Hybrid Solar and Storage Project plant generating more or less than last year?
Liberty Hybrid Solar and Storage Project generated 53,440 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 338.1% ahead of the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | n/a |
| 2025 | 53,440 |
| 2026 through August | 76,175 |
| 2025, same months | 17,387 |
Monthly generation, Jul 2025 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 12,516 |
| July 2026 | 11,970 |
| June 2026 | 9,810 |
| May 2026 | 8,789 |
| April 2026 | 8,162 |
| March 2026 | 10,591 |
| February 2026 | 7,976 |
| January 2026 | 6,361 |
| December 2025 | 5,170 |
| November 2025 | 7,726 |
| October 2025 | 11,346 |
| September 2025 | 11,811 |
| August 2025 | 7,034 |
| July 2025 | 10,353 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Liberty Hybrid Solar and Storage Project plant, and when do they retire?
1 operable generator totals 67.2 MW, with an average age of 0 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 more is proposed, totalling 65 MW.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 2020s | 1 | 67 | 100% | none reported |
Every generator, 2 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| LIB1 | Operating | Solar Photovoltaic | 67 | 2025 | n/a |
| LIB2 | Built, not yet operating | Batteries | 65 | 2026 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Liberty Hybrid Solar and Storage Project plant?
EIA lists no joint owners for Liberty Hybrid Solar and Storage Project. Liberty 1 Solar LLC operates the plant.
Source: EIA Form EIA-860, Owner, 2025 final.
Where is the Liberty Hybrid Solar and Storage Project plant?
Liberty Hybrid Solar and Storage Project is in Dayton, Harris County, Texas, at 30.0097° N, 95.0408° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which solar plants in Texas are similar in size?
Texas has 225 operable solar plants with 30,739 MW of capacity, and Liberty Hybrid Solar and Storage Project's 67.2 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Ellis Solar LLC | Ellis | 80 | 165,050 |
| Longbow Solar, LLC | Brazoria | 78 | 141,035 |
| Dileo Solar | Hill | 71 | 153,941 |
| Liberty Hybrid Solar and Storage Project | Harris | 67 | 53,440 |
| BT Cooke Solar, LLC | Cooke | 59 | 122,540 |
| Kellam Solar | Van Zandt | 59 | 110,615 |
| Brightside | Bee | 51 | 93,985 |