Coal power plant, Texas

Limestone coal power plant, Texas

Limestone is a 1,850 MW coal power plant in Limestone County, Texas, operated by NRG Texas Power LLC, and it generated 7,523,395 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.3% of the generation reported in Texas, and its capacity factor sits at the 52nd percentile of U.S. coal plants. By 2025 generation it ranks 116th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,850 MWNameplate capacity
51%Capacity factor, 2025, 52nd percentile, on 1,688 MW net summer
1.3%Of TX generation, 2025
39 yearsAverage generator age, by MW

How hard does the Limestone plant run compared with other coal plants?

The Limestone plant had a capacity factor of 51% in 2025 on 1,688 MW of net summer capacity, the 52nd percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 185 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Limestone51%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Limestone plant generating more or less than last year?

Limestone generated 7,523,395 MWh in 2025; EIA reports no 2024 total to compare. Through August 2026 it is running 12.0% behind the same months of 2025. 2024 has output for only 11 months, so the two years are not compared.

1 month shows net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20245,364,872
20257,523,395
2026 through August4,642,614
2025, same months5,272,761
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026923,816
July 2026858,717
June 2026536,096
May 2026413,717
April 2026444,894
March 2026383,610
February 2026616,199
January 2026465,565
December 2025428,072
November 2025388,054
October 2025608,685
September 2025825,823
August 2025735,988
July 2025905,201
June 2025739,645
May 2025704,317
April 2025523,274
March 2025384,883
February 2025392,318
January 2025887,135
December 2024803,293
November 2024473,696
October 2024583,290
September 2024612,632
August 2024767,324
July 2024757,700
June 2024199,867
May 2024-8,635
April 2024163,081
March 2024242,601
February 2024127,611
January 2024642,412

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Limestone plant?

Limestone made 1.3% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.9% of the state's 195,966 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 6th largest of 1,023 plants in Texas, the 86th largest of 14,327 in the U.S. and the 22nd largest of 195 coal plants. By 2025 generation it is the 11th largest of 816 generating plants in the state.

Limestone within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)1,850195,9660.9%
Generation (MWh)7,523,395592,896,1761.3%
Coal capacity (MW)1,85016,58211.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Limestone plant, and when do they retire?

2 operable generators total 1,850 MW, with an average age of 39 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s21,850100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal8931985n/a
2OperatingConventional Steam Coal9571986n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Limestone plant?

EIA lists no joint owners for Limestone. NRG Texas Power LLC operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Limestone plant?

Limestone is in Jewett, Limestone County, Texas, at 31.4219° N, 96.2525° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Texas are similar in size?

Texas has 12 operable coal plants with 16,582 MW of capacity, and Limestone's 1,850 MW is 11% of that.

Coal plants in Texas around this size
PlantCountyMW2025 MWh
W A ParishFort Bend2,73712,971,269
Martin LakeRusk2,3808,506,392
LimestoneLimestone1,8507,481,858
Oak Grove (TX)Robertson1,79510,940,486
Fayette Power ProjectFayette1,6908,435,395
J K SpruceBexar1,4896,425,335

Source: EIA Forms EIA-860 and EIA-923, 2025.