Coal power plant, Texas
Fayette Power Project, Texas
Fayette Power Project is a 1,690 MW coal power plant in Fayette County, Texas, operated by Lower Colorado River Authority, and it generated 8,452,543 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Texas, and its capacity factor sits at the 68th percentile of U.S. coal plants. By 2025 generation it ranks 89th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Fayette Power Project plant run compared with other coal plants?
The Fayette Power Project plant had a capacity factor of 60% in 2025 on 1,615 MW of net summer capacity, the 68th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 218 days at full output out of 365.
0%Shaded: the middle half of coal plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Fayette Power Project | 60% |
| Coal plants, 75th percentile | 63% |
| Coal plants, median | 49% |
| Coal plants, 25th percentile | 37% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Fayette Power Project plant generating more or less than last year?
Generation at Fayette Power Project rose 18.6% from 2024 to 2025, from 7,128,429 MWh to 8,452,543 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.
| Period | MWh |
|---|---|
| 2024 | 7,128,429 |
| 2025 | 8,452,543 |
| 2026 through August | 5,831,137 |
| 2025, same months | 5,996,023 |
Monthly generation, Jan 2024 to Aug 2026
| Month | MWh |
|---|---|
| August 2026 | 841,069 |
| July 2026 | 773,291 |
| June 2026 | 816,798 |
| May 2026 | 791,707 |
| April 2026 | 552,200 |
| March 2026 | 689,340 |
| February 2026 | 638,907 |
| January 2026 | 727,825 |
| December 2025 | 542,320 |
| November 2025 | 542,085 |
| October 2025 | 560,054 |
| September 2025 | 812,061 |
| August 2025 | 850,598 |
| July 2025 | 844,667 |
| June 2025 | 819,813 |
| May 2025 | 673,721 |
| April 2025 | 634,621 |
| March 2025 | 674,963 |
| February 2025 | 706,835 |
| January 2025 | 790,805 |
| December 2024 | 548,426 |
| November 2024 | 465,637 |
| October 2024 | 508,604 |
| September 2024 | 719,597 |
| August 2024 | 743,944 |
| July 2024 | 638,283 |
| June 2024 | 711,570 |
| May 2024 | 569,454 |
| April 2024 | 478,023 |
| March 2024 | 601,057 |
| February 2024 | 492,743 |
| January 2024 | 651,091 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Fayette Power Project plant, and when do they retire?
3 operable generators total 1,690 MW, with an average age of 43 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1970s | 1 | 615 | 36% | none reported |
| 1980s | 2 | 1,075 | 64% | none reported |
Every generator, 3 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Steam Coal | 615 | 1979 | n/a |
| 2 | Operating | Conventional Steam Coal | 615 | 1980 | n/a |
| 3 | Operating | Conventional Steam Coal | 460 | 1988 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Fayette Power Project plant?
2 owners report shares in Fayette Power Project; Austin Energy holds the largest named share, 36.4% or about 615 MW. Lower Colorado River Authority operates the plant. The listed shares add up to 72.8% of capacity; generators without joint owners are not on this list.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| Austin Energy | 36.4% | 615 | 3,075,880 |
| Lower Colorado River Authority | 36.4% | 615 | 3,075,880 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Fayette Power Project plant?
Fayette Power Project is in La Grange, Fayette County, Texas, at 29.9172° N, 96.7506° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).
Source: EIA Form EIA-860, Plant, 2025 final.
Which coal plants in Texas are similar in size?
Texas has 12 operable coal plants with 16,582 MW of capacity, and Fayette Power Project's 1,690 MW is 10% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Martin Lake | Rusk | 2,380 | 8,506,392 |
| Limestone | Limestone | 1,850 | 7,481,858 |
| Oak Grove (TX) | Robertson | 1,795 | 10,940,486 |
| Fayette Power Project | Fayette | 1,690 | 8,435,395 |
| J K Spruce | Bexar | 1,489 | 6,425,335 |
| Tolk | Lamb | 1,136 | 2,568,028 |
| Welsh | Titus | 1,116 | 4,106,765 |
Source: EIA Forms EIA-860 and EIA-923, 2025.