Coal power plant, Texas

Fayette Power Project, Texas

Fayette Power Project is a 1,690 MW coal power plant in Fayette County, Texas, operated by Lower Colorado River Authority, and it generated 8,452,543 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.4% of the generation reported in Texas, and its capacity factor sits at the 68th percentile of U.S. coal plants. By 2025 generation it ranks 89th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,690 MWNameplate capacity
60%Capacity factor, 2025, 68th percentile, on 1,615 MW net summer
1.4%Of TX generation, 2025
43 yearsAverage generator age, by MW

How hard does the Fayette Power Project plant run compared with other coal plants?

The Fayette Power Project plant had a capacity factor of 60% in 2025 on 1,615 MW of net summer capacity, the 68th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 218 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Fayette Power Project60%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Fayette Power Project plant generating more or less than last year?

Generation at Fayette Power Project rose 18.6% from 2024 to 2025, from 7,128,429 MWh to 8,452,543 MWh. Through August 2026 it is running 2.7% behind the same months of 2025.

Net generation by period
PeriodMWh
20247,128,429
20258,452,543
2026 through August5,831,137
2025, same months5,996,023
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026841,069
July 2026773,291
June 2026816,798
May 2026791,707
April 2026552,200
March 2026689,340
February 2026638,907
January 2026727,825
December 2025542,320
November 2025542,085
October 2025560,054
September 2025812,061
August 2025850,598
July 2025844,667
June 2025819,813
May 2025673,721
April 2025634,621
March 2025674,963
February 2025706,835
January 2025790,805
December 2024548,426
November 2024465,637
October 2024508,604
September 2024719,597
August 2024743,944
July 2024638,283
June 2024711,570
May 2024569,454
April 2024478,023
March 2024601,057
February 2024492,743
January 2024651,091

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Fayette Power Project plant?

Fayette Power Project made 1.4% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.9% of the state's 195,966 MW of capacity. Its share of output is 1.7 times its share of capacity. By capacity it is the 10th largest of 1,023 plants in Texas, the 118th largest of 14,327 in the U.S. and the 32nd largest of 195 coal plants. By 2025 generation it is the 7th largest of 816 generating plants in the state.

Fayette Power Project within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)1,690195,9660.9%
Generation (MWh)8,452,543592,896,1761.4%
Coal capacity (MW)1,69016,58210.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Fayette Power Project plant, and when do they retire?

3 operable generators total 1,690 MW, with an average age of 43 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s161536%none reported
1980s21,07564%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal6151979n/a
2OperatingConventional Steam Coal6151980n/a
3OperatingConventional Steam Coal4601988n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Fayette Power Project plant?

2 owners report shares in Fayette Power Project; Austin Energy holds the largest named share, 36.4% or about 615 MW. Lower Colorado River Authority operates the plant. The listed shares add up to 72.8% of capacity; generators without joint owners are not on this list.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
Austin Energy36.4%6153,075,880
Lower Colorado River Authority36.4%6153,075,880

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Fayette Power Project plant?

Fayette Power Project is in La Grange, Fayette County, Texas, at 29.9172° N, 96.7506° W. It sits in the Electric Reliability Council of Texas, Inc. balancing area (NERC region TRE).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Texas are similar in size?

Texas has 12 operable coal plants with 16,582 MW of capacity, and Fayette Power Project's 1,690 MW is 10% of that.

Coal plants in Texas around this size
PlantCountyMW2025 MWh
Martin LakeRusk2,3808,506,392
LimestoneLimestone1,8507,481,858
Oak Grove (TX)Robertson1,79510,940,486
Fayette Power ProjectFayette1,6908,435,395
J K SpruceBexar1,4896,425,335
TolkLamb1,1362,568,028
WelshTitus1,1164,106,765

Source: EIA Forms EIA-860 and EIA-923, 2025.