Coal power plant, Texas

Welsh coal power plant, Texas

Welsh is a 1,116 MW coal power plant in Titus County, Texas, operated by Southwestern Electric Power Co, and it generated 4,114,516 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.7% of the generation reported in Texas, and its capacity factor sits at the 44th percentile of U.S. coal plants. By 2025 generation it ranks 277th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

1,116 MWNameplate capacity
47%Capacity factor, 2025, 44th percentile, on 1,000 MW net summer
0.7%Of TX generation, 2025
46 yearsAverage generator age, by MW

How hard does the Welsh plant run compared with other coal plants?

The Welsh plant had a capacity factor of 47% in 2025 on 1,000 MW of net summer capacity, the 44th percentile of the 181 U.S. coal plants with at least 20 MW. The typical coal plant reached 49%. That equals about 171 days at full output out of 365.

0%Shaded: the middle half of coal plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Welsh47%
Coal plants, 75th percentile63%
Coal plants, median49%
Coal plants, 25th percentile37%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Welsh plant generating more or less than last year?

Generation at Welsh fell 2.5% from 2024 to 2025, from 4,218,483 MWh to 4,114,516 MWh. Through August 2026 it is running 29.0% behind the same months of 2025.

Net generation by period
PeriodMWh
20244,218,483
20254,114,516
2026 through August1,991,065
2025, same months2,805,956
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 2026355,280
July 2026422,373
June 2026280,714
May 202688,761
April 2026181,266
March 2026172,849
February 2026119,785
January 2026370,037
December 2025388,487
November 2025282,445
October 2025361,250
September 2025276,378
August 2025431,867
July 2025478,582
June 2025357,581
May 2025130,963
April 2025192,868
March 2025275,664
February 2025360,864
January 2025577,567
December 2024300,107
November 2024383,492
October 2024374,415
September 2024368,976
August 2024450,603
July 2024461,339
June 2024329,988
May 2024361,150
April 2024246,572
March 2024242,684
February 2024273,246
January 2024425,911

Source: EIA Form EIA-923, through August 2026.

How much of Texas' electricity comes from the Welsh plant?

Welsh made 0.7% of the 592,896,176 MWh reported by Texas plants in 2025, from 0.6% of the state's 195,966 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 24th largest of 1,023 plants in Texas, the 259th largest of 14,327 in the U.S. and the 68th largest of 195 coal plants. By 2025 generation it is the 30th largest of 816 generating plants in the state.

Welsh within Texas, 2025
MeasureThis plantTexasShare
Capacity (MW)1,116195,9660.6%
Generation (MWh)4,114,516592,896,1760.7%
Coal capacity (MW)1,11616,5826.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Welsh plant, and when do they retire?

2 operable generators total 1,116 MW, with an average age of 46 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860. 1 has already retired, totalling 558 MW.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1970s155850%none reported
1980s155850%none reported
Every generator, 3 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Steam Coal5581977n/a
3OperatingConventional Steam Coal5581982n/a
2RetiredConventional Steam Coal55819802016

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Welsh plant?

EIA lists no joint owners for Welsh. Southwestern Electric Power Co operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Southwestern Electric Power Co charge homes?

Southwestern Electric Power Co, the operator of Welsh, had an average residential price of 12.60¢ per kWh and an average bill of $146 a month in 2025, 18% below the Texas average of 15.40¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Texas
Southwestern Electric Power Co12.60¢$14618% lower
Texas average15.40¢$171
U.S. average17.23¢$15112% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Welsh plant?

Welsh is in Pittsburg, Titus County, Texas, at 33.0552° N, 94.8400° W. It sits in the Southwest Power Pool balancing area (NERC region MRO).

Source: EIA Form EIA-860, Plant, 2025 final.

Which coal plants in Texas are similar in size?

Texas has 12 operable coal plants with 16,582 MW of capacity, and Welsh's 1,116 MW is 7% of that.

Coal plants in Texas around this size
PlantCountyMW2025 MWh
Fayette Power ProjectFayette1,6908,435,395
J K SpruceBexar1,4896,425,335
TolkLamb1,1362,568,028
WelshTitus1,1164,106,765
Sandy Creek Energy StationMcLennan1,008718,678
Coleto CreekGoliad6223,090,781

Source: EIA Forms EIA-860 and EIA-923, 2025.