Limon III Wind LLC power plant, Colorado

Limon III Wind LLC is a 201 MW wind power plant in Lincoln County, Colorado, operated by Limon, and it generated 649,685 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.2% of the generation reported in Colorado, and its capacity factor sits at the 63rd percentile of U.S. wind plants. By 2025 generation it ranks 1,057th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

201 MWNameplate capacity
37%Capacity factor, 2025, 63rd percentile, on 201 MW net summer
1.2%Of CO generation, 2025
11 yearsAverage generator age, by MW

How hard does the Limon III Wind LLC plant run compared with other wind plants?

The Limon III Wind LLC plant had a capacity factor of 37% in 2025 on 201 MW of net summer capacity, the 63rd percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 135 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Limon III Wind LLC37%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Limon III Wind LLC plant generating more or less than last year?

Generation at Limon III Wind LLC fell 14.2% from 2024 to 2025, from 757,191 MWh to 649,685 MWh. Through August 2026 it is running 11.2% behind the same months of 2025.

Net generation by period
PeriodMWh
2024757,191
2025649,685
2026 through August360,546
2025, same months406,097
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202636,937
July 202643,915
June 202646,803
May 202633,643
April 202634,444
March 202662,827
February 202646,188
January 202655,789
December 202570,080
November 202556,729
October 202566,658
September 202550,121
August 202556,936
July 202564,179
June 202556,557
May 202543,651
April 202550,281
March 202526,095
February 202549,636
January 202558,762
December 202460,167
November 202454,258
October 202453,259
September 202469,865
August 202460,882
July 202455,758
June 202469,919
May 202480,733
April 202472,455
March 202467,870
February 202458,952
January 202453,073

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Limon III Wind LLC plant?

Limon III Wind LLC made 1.2% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.9% of the state's 22,712 MW of capacity. Its share of output is 1.3 times its share of capacity. By capacity it is the 33rd largest of 321 plants in Colorado, the 1,508th largest of 14,327 in the U.S. and the 260th largest of 1,358 wind plants. By 2025 generation it is the 24th largest of 292 generating plants in the state.

Limon III Wind LLC within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)20122,7120.9%
Generation (MWh)649,68555,830,8941.2%
Wind capacity (MW)2015,3493.8%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Limon III Wind LLC plant, and when do they retire?

1 operable generator totals 201 MW, with an average age of 11 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1201100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
WT1OperatingOnshore Wind Turbine2012014n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Limon III Wind LLC plant?

EIA lists no joint owners for Limon III Wind LLC. Limon operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Limon III Wind LLC plant?

Limon III Wind LLC is in Limon, Lincoln County, Colorado, at 39.3533° N, 103.4742° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Colorado are similar in size?

Colorado has 33 operable wind plants with 5,349 MW of capacity, and Limon III Wind LLC's 201 MW is 4% of that.

Wind plants in Colorado around this size
PlantCountyMW2025 MWh
Cedar Creek IIWeld248606,928
Niyol Wind, LLCLogan206794,979
Logan Wind EnergyLogan201557,021
Limon III Wind LLCLincoln201649,685
Limon Wind ILincoln200570,379
Limon Wind IILincoln200485,403
Bronco Plains Wind II, LLCKit Carson200668,612