Skip to main content
RateWatt

Wind power plant, Colorado

Limon Wind I power plant, Colorado

Limon Wind I is a 200 MW wind power plant in Lincoln County, Colorado, operated by Limon, and it generated 570,379 MWh in 2025 (Forms EIA-860 and EIA-923). That is 1.0% of the generation reported in Colorado, and its capacity factor sits at the 49th percentile of U.S. wind plants. By 2025 generation it ranks 1,186th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

200 MWNameplate capacity
33%Capacity factor, 2025, 49th percentile, on 200 MW net summer
1.0%Of CO generation, 2025
13 yearsAverage generator age, by MW

How hard does the Limon Wind I plant run compared with other wind plants?

The Limon Wind I plant had a capacity factor of 33% in 2025 on 200 MW of net summer capacity, the 49th percentile of the 1,031 U.S. wind plants with at least 20 MW. The typical wind plant reached 33%. That equals about 119 days at full output out of 365.

0%Shaded: the middle half of wind plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Limon Wind I33%
Wind plants, 75th percentile41%
Wind plants, median33%
Wind plants, 25th percentile26%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Limon Wind I plant generating more or less than last year?

Generation at Limon Wind I fell 3.6% from 2024 to 2025, from 591,742 MWh to 570,379 MWh. Through August 2026 it is running 13.5% behind the same months of 2025.

Net generation by period
PeriodMWh
2024591,742
2025570,379
2026 through August322,005
2025, same months372,393
Monthly generation, Jan 2024 to Aug 2026
MonthMWh
August 202638,847
July 202647,828
June 202643,069
May 202632,273
April 202627,506
March 202650,323
February 202635,442
January 202646,717
December 202557,065
November 202546,710
October 202557,445
September 202536,766
August 202551,003
July 202560,022
June 202552,581
May 202540,139
April 202547,716
March 202526,415
February 202546,454
January 202548,063
December 202450,985
November 202453,897
October 202453,119
September 202454,512
August 202453,690
July 202442,676
June 202451,138
May 202452,338
April 202447,298
March 202451,763
February 202442,299
January 202438,027

Source: EIA Form EIA-923, through August 2026.

How much of Colorado's electricity comes from the Limon Wind I plant?

Limon Wind I made 1.0% of the 55,830,894 MWh reported by Colorado plants in 2025, from 0.9% of the state's 22,712 MW of capacity. By capacity it is the 34th largest of 321 plants in Colorado, the 1,524th largest of 14,327 in the U.S. and the 287th largest of 1,358 wind plants. By 2025 generation it is the 29th largest of 292 generating plants in the state.

Limon Wind I within Colorado, 2025
MeasureThis plantColoradoShare
Capacity (MW)20022,7120.9%
Generation (MWh)570,37955,830,8941.0%
Wind capacity (MW)2005,3493.7%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Limon Wind I plant, and when do they retire?

1 operable generator totals 200 MW, with an average age of 13 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
2010s1200100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingOnshore Wind Turbine2002012n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Limon Wind I plant?

EIA lists no joint owners for Limon Wind I. Limon operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

Where is the Limon Wind I plant?

Limon Wind I is in Limon, Lincoln County, Colorado, at 39.3810° N, 103.5732° W. It sits in the Public Service Company of Colorado balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which wind plants in Colorado are similar in size?

Colorado has 33 operable wind plants with 5,349 MW of capacity, and Limon Wind I's 200 MW is 4% of that.

Wind plants in Colorado around this size
PlantCountyMW2025 MWh
Niyol Wind, LLCLogan206794,979
Logan Wind EnergyLogan201557,021
Limon III Wind LLCLincoln201649,685
Limon Wind ILincoln200570,379
Limon Wind IILincoln200485,403
Bronco Plains Wind II, LLCKit Carson200668,612
Peetz Table Wind EnergyLogan200673,906

Source: EIA Forms EIA-860 and EIA-923, 2025.