Hydro power plant, Washington

Little Falls hydroelectric power plant, Washington

Little Falls (WA) is a 43.2 MW hydro power plant in Lincoln County, Washington, operated by Avista Corp, and it generated 188,764 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.2% of the generation reported in Washington, and its capacity factor sits at the 86th percentile of U.S. hydro plants. By 2025 generation it ranks 2,569th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

43.2 MWNameplate capacity
50%Capacity factor, 2025, 86th percentile, on 43.2 MW net summer
0.2%Of WA generation, 2025
115 yearsAverage generator age, by MW

How hard does the Little Falls (WA) plant run compared with other hydro plants?

The Little Falls (WA) plant had a capacity factor of 50% in 2025 on 43.2 MW of net summer capacity, the 86th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 182 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Little Falls (WA)50%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Little Falls (WA) plant generating more or less than last year?

Generation at Little Falls (WA) rose 1.8% from 2024 to 2025, from 185,339 MWh to 188,764 MWh.

Net generation by period
PeriodMWh
2024185,339
2025188,764
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202523,148
November 202512,721
October 20258,260
September 20254,770
August 20254,083
July 20255,137
June 202514,133
May 202525,623
April 202524,845
March 202526,309
February 202515,410
January 202524,325
December 202418,505
November 202414,327
October 20247,961
September 20243,671
August 20244,692
July 20247,329
June 202418,765
May 202417,508
April 202425,238
March 202423,723
February 202424,366
January 202419,254

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Little Falls (WA) plant?

Little Falls (WA) made 0.2% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.1% of the state's 31,712 MW of capacity. Its share of output is 1.4 times its share of capacity. By capacity it is the 76th largest of 139 plants in Washington, the 4,017th largest of 14,327 in the U.S. and the 293rd largest of 1,393 hydro plants. By 2025 generation it is the 63rd largest of 129 generating plants in the state.

Little Falls (WA) within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)4331,7120.1%
Generation (MWh)188,764101,512,8620.2%
Hydro capacity (MW)4321,4620.2%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Little Falls (WA) plant, and when do they retire?

4 operable generators total 43.2 MW, with an average age of 115 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1910s443100%none reported
Every generator, 4 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric111910n/a
2OperatingConventional Hydroelectric111910n/a
3OperatingConventional Hydroelectric111910n/a
4OperatingConventional Hydroelectric111911n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Little Falls (WA) plant?

EIA lists no joint owners for Little Falls (WA). Avista Corp operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does Avista Corp charge homes?

Avista Corp, the operator of Little Falls (WA), had an average residential price of 14.16¢ per kWh and an average bill of $130 a month in 2025, 7% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
Avista Corp14.16¢$1307% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Little Falls (WA) plant?

Little Falls (WA) is in Ford, Lincoln County, Washington, at 47.8217° N, 117.9167° W. It sits in the Avista Corporation balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Little Falls (WA)'s 43.2 MW is 0% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
ChelanChelan59325,166
AlderPierce51187,040
Cushman 1Mason50107,759
Little Falls (WA)Lincoln43188,764
Snoqualmie 2King39106,754
Nine MileSpokane38132,210
Cedar Falls (WA)King3053,629

Source: EIA Forms EIA-860 and EIA-923, 2025.