Hydro power plant, Washington

Cedar Falls hydroelectric power plant, Washington

Cedar Falls (WA) is a 30 MW hydro power plant in King County, Washington, operated by City of Seattle-(WA), and it generated 53,629 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 21st percentile of U.S. hydro plants. By 2025 generation it ranks 4,008th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

30 MWNameplate capacity
20%Capacity factor, 2025, 21st percentile, on 30 MW net summer
0.1%Of WA generation, 2025
100 yearsAverage generator age, by MW

How hard does the Cedar Falls (WA) plant run compared with other hydro plants?

The Cedar Falls (WA) plant had a capacity factor of 20% in 2025 on 30 MW of net summer capacity, the 21st percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 74 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Cedar Falls (WA)20%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Cedar Falls (WA) plant generating more or less than last year?

Cedar Falls (WA) generated 53,629 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 1 month, so the two years are not compared.

12 months show net generation below zero, when the plant used more power than it sent out, so the months are listed below rather than charted.

Net generation by period
PeriodMWh
20246,180
202553,629
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 202514,932
November 20253,959
October 20254,703
September 20251,419
August 202539
July 20252,304
June 20251,313
May 2025-29
April 20255,614
March 20258,533
February 20254,483
January 20256,359
December 20246,794
November 2024-58
October 2024-32
September 2024-16
August 2024-10
July 2024-16
June 2024-20
May 2024-59
April 2024-75
March 2024-102
February 2024-101
January 2024-125

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Cedar Falls (WA) plant?

Cedar Falls (WA) made 0.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.1% of the state's 31,712 MW of capacity. Its share of output is smaller than its share of capacity. By capacity it is the 79th largest of 139 plants in Washington, the 4,354th largest of 14,327 in the U.S. and the 370th largest of 1,393 hydro plants. By 2025 generation it is the 86th largest of 129 generating plants in the state.

Cedar Falls (WA) within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)3031,7120.1%
Generation (MWh)53,629101,512,8620.1%
Hydro capacity (MW)3021,4620.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Cedar Falls (WA) plant, and when do they retire?

2 operable generators total 30 MW, with an average age of 100 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1920s230100%none reported
Every generator, 2 in all
UnitStatusTechnologyMWIn servicePlanned retirement
5OperatingConventional Hydroelectric151921n/a
6OperatingConventional Hydroelectric151929n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Cedar Falls (WA) plant?

EIA lists no joint owners for Cedar Falls (WA). City of Seattle-(WA) operates the plant.

Source: EIA Form EIA-860, Owner, 2025 final.

What does City of Seattle charge homes?

City of Seattle, the operator of Cedar Falls (WA), had an average residential price of 14.74¢ per kWh and an average bill of $87 a month in 2025, 12% above the Washington average of 13.17¢.

Average residential price and bill, 2025
MeasurePriceMonthly billAgainst Washington
City of Seattle14.74¢$8712% higher
Washington average13.17¢$124
U.S. average17.23¢$15131% higher

Source: EIA Form EIA-861, final 2025. Average price is revenue divided by sales. It is what the seller's customers paid on average, not the cost of this plant's output.

Where is the Cedar Falls (WA) plant?

Cedar Falls (WA) is in North Bend, King County, Washington, at 47.4193° N, 121.7819° W. It sits in the Seattle City Light balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Cedar Falls (WA)'s 30 MW is 0% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Little Falls (WA)Lincoln43188,764
Snoqualmie 2King39106,754
Nine MileSpokane38132,210
Cedar Falls (WA)King3053,629
PackwoodLewis2873,848
Main Canal HeadworksGrant27105,240
Twin Falls HydroKing2459,297

Source: EIA Forms EIA-860 and EIA-923, 2025.