Main Canal Headworks is a 26.8 MW hydro power plant in Grant County, Washington, operated by Columbia Basin Hydropower, and it generated 105,240 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 78th percentile of U.S. hydro plants. By 2025 generation it ranks 3,338th of 12,977 U.S. plants.
Latest data: August 2026; data loaded .
How hard does the Main Canal Headworks plant run compared with other hydro plants?
The Main Canal Headworks plant had a capacity factor of 45% in 2025 on 26.8 MW of net summer capacity, the 78th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 164 days at full output out of 365.
0%Shaded: the middle half of hydro plants. Mark: this plant.105%
| Measure | Capacity factor |
|---|---|
| Main Canal Headworks | 45% |
| Hydro plants, 75th percentile | 44% |
| Hydro plants, median | 33% |
| Hydro plants, 25th percentile | 22% |
Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.
Is the Main Canal Headworks plant generating more or less than last year?
Main Canal Headworks generated 105,240 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 8 months, so the two years are not compared.
| Period | MWh |
|---|---|
| 2024 | 103,306 |
| 2025 | 105,240 |
Monthly generation, Jan 2024 to Dec 2025
| Month | MWh |
|---|---|
| December 2025 | 0 |
| November 2025 | 0 |
| October 2025 | 7,760 |
| September 2025 | 11,690 |
| August 2025 | 16,113 |
| July 2025 | 18,623 |
| June 2025 | 17,354 |
| May 2025 | 16,942 |
| April 2025 | 13,648 |
| March 2025 | 3,110 |
| February 2025 | 0 |
| January 2025 | 0 |
| December 2024 | 0 |
| November 2024 | 0 |
| October 2024 | 8,018 |
| September 2024 | 12,470 |
| August 2024 | 15,620 |
| July 2024 | 18,264 |
| June 2024 | 16,770 |
| May 2024 | 16,282 |
| April 2024 | 15,095 |
| March 2024 | 787 |
| February 2024 | 0 |
| January 2024 | 0 |
Source: EIA Form EIA-923, through August 2026.
Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.
How old are the generators at the Main Canal Headworks plant, and when do they retire?
1 operable generator totals 26.8 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.
| Entered service | Units | MW | Share | Planned retirement |
|---|---|---|---|---|
| 1980s | 1 | 27 | 100% | none reported |
Every generator, 1 in all
| Unit | Status | Technology | MW | In service | Planned retirement |
|---|---|---|---|---|---|
| 1 | Operating | Conventional Hydroelectric | 27 | 1987 | n/a |
Source: EIA Form EIA-860, Generator, 2025 final.
Who owns the Main Canal Headworks plant?
3 owners report shares in Main Canal Headworks; East Columbia Basin Irr Dist holds the largest named share, 33.3% or about 8.9 MW. Columbia Basin Hydropower operates the plant.
| Owner | Share | MW | 2025 MWh, by share |
|---|---|---|---|
| East Columbia Basin Irr Dist | 33.3% | 9 | 35,087 |
| Quincy-Columbia Basin Irr Dist | 33.3% | 9 | 35,076 |
| South Columbia Basin Irr Dist | 33.3% | 9 | 35,076 |
Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.
Where is the Main Canal Headworks plant?
Main Canal Headworks is in Coulee City, Grant County, Washington, at 47.6164° N, 119.2992° W. It sits in the Avista Corporation balancing area (NERC region WECC).
Source: EIA Form EIA-860, Plant, 2025 final.
Which hydro plants in Washington are similar in size?
Washington has 73 operable hydro plants with 21,462 MW of capacity, and Main Canal Headworks' 26.8 MW is 0% of that.
| Plant | County | MW | 2025 MWh |
|---|---|---|---|
| Nine Mile | Spokane | 38 | 132,210 |
| Cedar Falls (WA) | King | 30 | 53,629 |
| Packwood | Lewis | 28 | 73,848 |
| Main Canal Headworks | Grant | 27 | 105,240 |
| Twin Falls Hydro | King | 24 | 59,297 |
| Electron | Pierce | 23 | 0 |
| Upriver Dam Hydro Plant | Spokane | 18 | 39,873 |
Source: EIA Forms EIA-860 and EIA-923, 2025.