Skip to main content
RateWatt

Hydro power plant, Washington

Main Canal Headworks hydroelectric power plant, Washington

Main Canal Headworks is a 26.8 MW hydro power plant in Grant County, Washington, operated by Columbia Basin Hydropower, and it generated 105,240 MWh in 2025 (Forms EIA-860 and EIA-923). That is 0.1% of the generation reported in Washington, and its capacity factor sits at the 78th percentile of U.S. hydro plants. By 2025 generation it ranks 3,338th of 12,977 U.S. plants.

Latest data: August 2026; data loaded .

26.8 MWNameplate capacity
45%Capacity factor, 2025, 78th percentile, on 26.8 MW net summer
0.1%Of WA generation, 2025
38 yearsAverage generator age, by MW

How hard does the Main Canal Headworks plant run compared with other hydro plants?

The Main Canal Headworks plant had a capacity factor of 45% in 2025 on 26.8 MW of net summer capacity, the 78th percentile of the 427 U.S. hydro plants with at least 20 MW. The typical hydro plant reached 33%. That equals about 164 days at full output out of 365.

0%Shaded: the middle half of hydro plants. Mark: this plant.105%

Capacity factor, 2025
MeasureCapacity factor
Main Canal Headworks45%
Hydro plants, 75th percentile44%
Hydro plants, median33%
Hydro plants, 25th percentile22%

Source: EIA Forms EIA-860 and EIA-923, 2025. Capacity factor is net generation divided by capacity times the hours in the year, using net summer capacity, as EIA does. Values above 105% are left out of the comparison.

Is the Main Canal Headworks plant generating more or less than last year?

Main Canal Headworks generated 105,240 MWh in 2025; EIA reports no 2024 total to compare. 2024 has output for only 8 months, so the two years are not compared.

Net generation by period
PeriodMWh
2024103,306
2025105,240
Monthly generation, Jan 2024 to Dec 2025
MonthMWh
December 20250
November 20250
October 20257,760
September 202511,690
August 202516,113
July 202518,623
June 202517,354
May 202516,942
April 202513,648
March 20253,110
February 20250
January 20250
December 20240
November 20240
October 20248,018
September 202412,470
August 202415,620
July 202418,264
June 202416,770
May 202416,282
April 202415,095
March 2024787
February 20240
January 20240

Source: EIA Form EIA-923, through August 2026.

How much of Washington's electricity comes from the Main Canal Headworks plant?

Main Canal Headworks made 0.1% of the 101,512,862 MWh reported by Washington plants in 2025, from 0.1% of the state's 31,712 MW of capacity. Its share of output is 1.2 times its share of capacity. By capacity it is the 82nd largest of 139 plants in Washington, the 4,502nd largest of 14,327 in the U.S. and the 387th largest of 1,393 hydro plants. By 2025 generation it is the 76th largest of 129 generating plants in the state.

Main Canal Headworks within Washington, 2025
MeasureThis plantWashingtonShare
Capacity (MW)2731,7120.1%
Generation (MWh)105,240101,512,8620.1%
Hydro capacity (MW)2721,4620.1%

Source: EIA Forms EIA-860 and EIA-923, 2025. State totals add up the plants in these forms, including net use by storage.

How old are the generators at the Main Canal Headworks plant, and when do they retire?

1 operable generator totals 26.8 MW, with an average age of 38 years weighted by capacity at the end of 2025. No operable generator has a planned retirement date on Form EIA-860.

Operable generators by decade in service
Entered serviceUnitsMWSharePlanned retirement
1980s127100%none reported
Every generator, 1 in all
UnitStatusTechnologyMWIn servicePlanned retirement
1OperatingConventional Hydroelectric271987n/a

Source: EIA Form EIA-860, Generator, 2025 final.

Who owns the Main Canal Headworks plant?

3 owners report shares in Main Canal Headworks; East Columbia Basin Irr Dist holds the largest named share, 33.3% or about 8.9 MW. Columbia Basin Hydropower operates the plant.

Reported ownership of operable capacity
OwnerShareMW2025 MWh, by share
East Columbia Basin Irr Dist33.3%935,087
Quincy-Columbia Basin Irr Dist33.3%935,076
South Columbia Basin Irr Dist33.3%935,076

Source: EIA Form EIA-860, Owner, 2025 final. MW and MWh by share multiply the plant totals by each owner's percentage.

Where is the Main Canal Headworks plant?

Main Canal Headworks is in Coulee City, Grant County, Washington, at 47.6164° N, 119.2992° W. It sits in the Avista Corporation balancing area (NERC region WECC).

Source: EIA Form EIA-860, Plant, 2025 final.

Which hydro plants in Washington are similar in size?

Washington has 73 operable hydro plants with 21,462 MW of capacity, and Main Canal Headworks' 26.8 MW is 0% of that.

Hydro plants in Washington around this size
PlantCountyMW2025 MWh
Nine MileSpokane38132,210
Cedar Falls (WA)King3053,629
PackwoodLewis2873,848
Main Canal HeadworksGrant27105,240
Twin Falls HydroKing2459,297
ElectronPierce230
Upriver Dam Hydro PlantSpokane1839,873

Source: EIA Forms EIA-860 and EIA-923, 2025.